Article
Publication date: 29 December 2022

Zhenmin Yuan, Yuan Chang, Yunfeng Chen, Yaowu Wang, Wei Huang and Chen Chen

Precast wall lifting during prefabricated building construction faces multiple non-lean problems, such as inaccurate lifting-time estimation, unreasonable resource allocation and…

Abstract

Purpose

Precast wall lifting during prefabricated building construction faces multiple non-lean problems, such as inaccurate lifting-time estimation, unreasonable resource allocation and improper process design. This study aims to identify the pathways for improving lifting performance to advance lean construction of prefabricated buildings.

Design/methodology/approach

This study developed a methodological framework that integrates the discrete event simulation method, the elimination, combination, rearrangement and simplification (ECRS) technique and intelligent optimization tool. Two schemes of precast wall lifting, namely, the enterprise's business as usual (BAU) and enterprise-leading (EL) schemes, were set to benchmark lifting performance. Furthermore, a best-practice (BP) scheme was modeled from the perspective of lifting activity ECRS and resource allocation for performance optimization.

Findings

A real project was selected to test the effect of the methodological framework. The results showed that compared with the EL scheme, the BP scheme reduced the total lifting time (TLT) by 6.3% and mitigated the TLT uncertainty (the gap between the maximum and minimum time values) by 20.6%. Under the BP scheme, increasing the resource inputs produces an insignificant effect in reducing TLT, i.e. increasing the number of component operators in the caulking subprocess from one to two only shortened the TLT by 3.6%, and no further time reduction was achieved as more component operators were added.

Originality/value

To solve non-lean problems associated with prefabricated building construction, this study provides a methodological framework that can separate a typical precast wall lifting process into fine-level activities. Besides, it also identifies the pathways (including the learning effect mitigation, labor and machinery resource adjustment and activities’ improvement) to reducing TLT and its uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 April 2021

Guodong Ni, Ziyao Zhang, Zhenmin Yuan, Haitao Huang, Na Xu and Yongliang Deng

The purpose of this paper is to figure out the paths about transformation of tacit knowledge into explicit knowledge, i.e. tacit knowledge explicating (TKE) in real estate…

1051

Abstract

Purpose

The purpose of this paper is to figure out the paths about transformation of tacit knowledge into explicit knowledge, i.e. tacit knowledge explicating (TKE) in real estate companies, and determine the influencing factors of TKE in Chinese real estate companies to enable enterprises make better use of their knowledge resources.

Design/methodology/approach

The study adopted an exploratory design method using thematic analysis and grounded theory, and semi-structured interviews were conducted to collect data. The interviewees consisted of employees in different positions, who come from Chinese real estate companies with different ranking ranges and different knowledge management levels. Data collection was divided into two rounds for the identification of transformation paths and influencing factors.

Findings

This study has shown that 11 paths about TKE divided into solidified organization process and construction of organizational infrastructure go into effect within the real estate companies. Factors influencing TKE in real estate companies concern three main categories: organizational distal factors, contextual proximal factors and individual factors, including 21 subordinates in total. Furthermore, correlation between TKE paths and influencing factors is established.

Research limitations/implications

Research results may lack generalizability due to the method adopted. Therefore, researchers are encouraged to verify the outcomes of this research.

Practical implications

This research provides a new idea and solutions for the tacit knowledge management in real estate companies.

Originality/value

To the best of the authors’ knowledge, this study is the first to systematically identify paths and the influencing factors of TKE in real estate companies, contribute to the incipient but growing understanding of achievement of “tacit to explicit” and enrich the corporate tacit knowledge management literature.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 July 2022

Lixuan Jiang, Hua Zhong, Jianghong Chen, Jiajia Cheng, Shilong Chen, Zili Gong, Zhihui Lun, Jinhua Zhang and Zhenmin Su

The construction industry is facing challenges not only for workers' mobility in the pandemic situation but also for Lean Construction (LC) practise in responding to the…

Abstract

Purpose

The construction industry is facing challenges not only for workers' mobility in the pandemic situation but also for Lean Construction (LC) practise in responding to the high-quality development during the post-pandemic. As such, this paper presents a construction workforce management framework based on LC to manage both the emergency goal in migrant worker management and the long-term goal in labour productivity improvement in China.

Design/methodology/approach

The framework is created based on the integrated culture and technology strategies of LC. A combination of qualitative and quantitative methods is taken to explore factors influencing the mobility of construction workers and to measure labour productivity improvement. The case study approach is adopted to demonstrate the framework application.

Findings

For method application, a time-and-motion study and Percent Plan Complete indicator are proposed to offer labour productivity measurements of “resources efficiency” and “flow efficiency”. Moreover, the case study provides an industry level solution for construction workforce management and Lean Construction culture shaping, as well as witnesses the LC culture and technology strategies alignment contributing to LC practise innovation.

Originality/value

Compared with previous studies which emphasised solely LC techniques rather than socio-technical system thinking, the proposed integration framework as well as implementation of “Worker's Home” and “Lean Work Package” management models in the COVID-19 pandemic contribute to new extensions of both the fundamental of knowledge and practise in LC.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 October 2021

Rezuana Islam, Sajal Chowdhury, Nusrat Jannat and Pranjib Paul

Local dwellings of Bangladesh have specific environmental characteristics. These dwellings extensively use locally available materials and construction techniques. Therefore…

Abstract

Purpose

Local dwellings of Bangladesh have specific environmental characteristics. These dwellings extensively use locally available materials and construction techniques. Therefore, carbon footprint (CF), as a prominent environmental parameter, is greatly affected by construction materials and techniques. Nonetheless, scientific justification is limited to evaluate CF of these dwellings in Bangladesh according to different local construction materials. The main purpose of this study is to evaluate different rural dwellings’ CF for both construction and operational phases toward the development of low carbon society in Bangladesh.

Design/methodology/approach

For evaluating CF, literature review and field studies were conducted to specify and categorize cases. An intensive field monitoring and occupant's survey were performed during summer. A widely recognized compliant database and assessment tool “Ecoinvent v3” was used based on International Organization for Standardization (ISO) 14040 and 14044. Quantitative and qualitative data were collected to evaluate constructional and operational stages of carbon emission using hybrid methods formed by process-based and economic input–output life cycle analysis (EIO-LCA) approaches.

Findings

The study indicates that different building materials significantly impact on dwelling's amount of carbon emission according to construction techniques. Brick dwelling's construction stage carbon emission was nearly 3.86 times higher than timber, whereas, 6.75 times higher than mud dwelling. In terms of operational stage, local brick dwelling emits higher carbon compared to others relating to occupants’ lifestyle and activities.

Originality/value

This study will contribute to helping professionals and policy-makers to interpret and evaluate architectural design and construction processes for improving low-carbon dwellings in Bangladesh.

Details

Built Environment Project and Asset Management, vol. 12 no. 3
Type: Research Article
ISSN: 2044-124X