Search results

1 – 5 of 5
Article
Publication date: 29 May 2020

Yingbo Ji, Kai Qi, Yuan Qi, Yan Li, Hong Xian Li, Zhen Lei and Yan Liu

This research aims to propose a comparative environmental analysis of conventional and prefabricated construction techniques utilizing a building information modelling (BIM…

1316

Abstract

Purpose

This research aims to propose a comparative environmental analysis of conventional and prefabricated construction techniques utilizing a building information modelling (BIM) technique.

Design/methodology/approach

A set of indicators are selected to assess the environmental emissions throughout the construction life cycle, based on BIM platform. An existing project involving ten apartment buildings in Shanghai is selected as a case study.

Findings

The results reveal that prefabricated construction demonstrates environment-friendly performance with some exceptions of acidification and mineral resource consumption. Environmental impacts can also be further reduced by increasing the projected area ratio and percentage of project prefabrication.

Originality/value

Overall, the proposed method can be used to identify relevant environmental merits and for decision-making of appropriate construction techniques in building construction projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 February 2024

Xinnan Liu, Jiani Meng, Jiayi Wang and Yingbo Ji

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated…

Abstract

Purpose

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated construction.

Design/methodology/approach

The structural equation model (SEM) is used to identify and verify the relationship between factors influencing supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. The system dynamics (SD) model is constructed to dynamically simulate the specific effects of different influencing factors.

Findings

Results indicate that: (1) An evaluation index system for supply chain resilience of prefabricated construction containing five first-level indicators and 36 second-level indicators is constructed; (2) Ability to anticipate, ability to respond, ability to adapt, ability to recover and ability to learn are positively correlated with the supply chain resilience of prefabricated construction and (3) ANT3 (information system), RES1 (quick response), ADA3 (buffer stock) and LEA4 (trust) are the most leading factors influencing supply chain resilience of prefabricated construction over time.

Originality/value

This study fulfills the need for an in-depth exploration of the various influencing factors on supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. Furthermore, this study provides improvement strategies to enhance supply chain resilience of prefabricated construction in China.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 January 2023

Peter Sutterby, Xiangming Wang, Hong Xian Li and Yingbo Ji

Effective maintenance of construction supply chains is paramount to business continuity during the pandemic. Focusing on a large private Australian construction company, this…

1809

Abstract

Purpose

Effective maintenance of construction supply chains is paramount to business continuity during the pandemic. Focusing on a large private Australian construction company, this research aims to investigate to what extent the current pandemic has affected the daily operations of this company. This research touches on the broader effect on the industry, while it narrows the focus on how effective construction supply chain management can minimise a pandemic's negative impact on a company. The critical question will be how private contractors that primarily rely on social infrastructure projects can fortify their supply chains and general operations during the global pandemic.

Design/methodology/approach

A mixed qualitative and quantitative approach is employed in this research. Based on literature review and question design, data is collected through interviews with various stakeholders. Moreover, operation data is also collected from the case company to support the results and findings.

Findings

The respondents have generally agreed that the case company has effectively managed its supply chains to this point of the pandemic through the implementation of supply chain monitoring processes and maintaining stable relationships with stakeholders. This is supported by the operation data of the case company.

Originality/value

This is timely-conducted research, and it is original research with invaluable operation data. This case study is conducted during a pandemic and provides lessons learned for global supply chain management in the post-pandemic period.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596

Article
Publication date: 31 January 2018

Michael Arias, Rodrigo Saavedra, Maira R. Marques, Jorge Munoz-Gama and Marcos Sepúlveda

Human resource allocation is considered a relevant problem in business process management (BPM). The successful allocation of available resources for the execution of process…

3262

Abstract

Purpose

Human resource allocation is considered a relevant problem in business process management (BPM). The successful allocation of available resources for the execution of process activities can impact on process performance, reduce costs and obtain a better productivity of the resources. In particular, process mining is an emerging discipline that allows improvement of the resource allocation based on the analysis of historical data. The purpose of this paper is to provide a broad review of primary studies published in the research area of human resource allocation in BPM and process mining.

Design/methodology/approach

A systematic mapping study (SMS) was conducted in order to classify the proposed approaches to allocate human resources. A total of 2,370 studies published between January 2005 and July 2016 were identified. Through a selection protocol, a group of 95 studies were selected.

Findings

Human resource allocation is an emerging research area that has been evolving over time, generating new proposals that are increasingly applied to real case studies. The majority of proposed approaches relate to the period 2011-2016. Journals and conference proceedings are the most common venues. Validation research and evaluation research are the most common research types. There are two main evaluation methods: simulation and case studies.

Originality/value

This study aims to provide an initial assessment of the state of the art in the research area of human resource allocation in BPM and process mining. To the best of the authors’ knowledge, this is the first research that has been conducted to date that generates a SMS in this research area.

Details

Management Decision, vol. 56 no. 2
Type: Research Article
ISSN: 0025-1747

Keywords

1 – 5 of 5