Article
Publication date: 14 March 2024

Pengkun Liu, Zhewen Yang, Jing Huang and Ting-Kwei Wang

The purpose of this study is to scrutinize the influence of individual learning styles on the effectiveness of augmented reality (AR)-based learning in structural engineering…

Abstract

Purpose

The purpose of this study is to scrutinize the influence of individual learning styles on the effectiveness of augmented reality (AR)-based learning in structural engineering. There has been a lack of research examining the correlation between learning efficiency and learning style, particularly in the context of quantitatively assessing the efficacy of AR in structural engineering education.

Design/methodology/approach

Using Kolb’s experiential learning theory (ELT), a model that emphasizes learning through experience, students from the construction management department are assigned four learning styles (converging, assimilating, diverging and accommodating). Performance data were gathered, appraised, and compared through the three dimensions from the Knowledge, Attitude and Practices (KAP) survey model across four categories of Kolb’s learning styles in both text-graph (TG)-based and AR-based learning settings.

Findings

The findings indicate that AR-based materials positively impact structural engineering education by enhancing overall learning performance more than TG-based materials. It is also found that the learning style has a profound influence on learning effectiveness, with AR technology markedly improving the information retrieval processes, particularly for converging and assimilating learners, then diverging learners, with a less significant impact on accommodating learners.

Originality/value

These results corroborate prior research analyzing learners' outcomes with hypermedia and informational learning systems. It was found that learners with an “abstract” approach (convergers and assimilators) outperform those with a “concrete” approach (divergers and accommodators). This research emphasizes the importance of considering learning styles before integrating technologies into civil engineering education, thereby assisting software developers and educational institutions in creating more effective teaching materials tailored to specific learning styles.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 February 2024

Wenqi Mao, Kexin Ran, Ting-Kwei Wang, Anyuan Yu, Hongyue Lv and Jieh-Haur Chen

Although extensive research has been conducted on precast production, irregular component loading constraints have received little attention, resulting in limitations for…

Abstract

Purpose

Although extensive research has been conducted on precast production, irregular component loading constraints have received little attention, resulting in limitations for transportation cost optimization. Traditional irregular component loading methods are based on past performance, which frequently wastes vehicle space. Additionally, real-time road conditions, precast component assembly times, and delivery vehicle waiting times due to equipment constraints at the construction site affect transportation time and overall transportation costs. Therefore, this paper aims to provide an optimization model for Just-In-Time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time.

Design/methodology/approach

In order to propose a JIT (just-in-time) delivery optimization model, the effects of the sizes of irregular precast components, the assembly time, and the loading methods are considered in the 3D loading constraint model. In addition, for JIT delivery, incorporating real-time road conditions in the transportation process is essential to mitigate delays in the delivery of precast components. The 3D precast component loading problem is solved by using a hybrid genetic algorithm which mixes the genetic algorithm and the simulated annealing algorithm.

Findings

A real case study was used to validate the JIT delivery optimization model. The results indicated this study contributes to the optimization of strategies for loading irregular precast components and the reduction of transportation costs by 5.38%.

Originality/value

This study establishes a JIT delivery optimization model with the aim of reducing transportation costs by considering 3D loading constraints, real-time road conditions and assembly time. The irregular precast component is simplified into 3D bounding box and loaded with three-space division heuristic packing algorithm. In addition, the hybrid algorithm mixing the genetic algorithm and the simulated annealing algorithm is to solve the 3D container loading problem, which provides both global search capability and the ability to perform local searching. The JIT delivery optimization model can provide decision-makers with a more comprehensive and economical strategy for loading and transporting irregular precast components.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 July 2020

Wenpei Xu and Ting-Kwei Wang

This study provides a safety prewarning mechanism, which includes a comprehensive risk assessment model and a safety prewarning system. The comprehensive risk assessment model is…

Abstract

Purpose

This study provides a safety prewarning mechanism, which includes a comprehensive risk assessment model and a safety prewarning system. The comprehensive risk assessment model is capable of assessing nine safety indicators, which can be categorised into workers’ behaviour, environment and machine-related safety indicators, and the model is embedded in the safety prewarning system. The safety prewarning system can automatically extract safety information from surveillance cameras based on computer vision, assess risks based on the embedded comprehensive risk assessment model, categorise risks into five levels and provide timely suggestions.

Design/methodology/approach

Firstly, the comprehensive risk assessment model is constructed by adopting grey multihierarchical analysis method. The method combines the Analytic Hierarchy Process (AHP) and the grey clustering evaluation in the grey theory. Expert knowledge, obtained through the questionnaire approach, contributes to set weights of risk indicators and evaluate risks. Secondly, a safety prewarning system is developed, including data acquisition layer, data processing layer and prewarning layer. Computer vision is applied in the system to automatically extract real-time safety information from the surveillance cameras. The safety information is then processed through the comprehensive risk assessment model and categorized into five risk levels. A case study is presented to verify the proposed mechanism.

Findings

Through a case study, the result shows that the proposed mechanism is capable of analyzing integrated human-machine-environment risk, timely categorising risks into five risk levels and providing potential suggestions.

Originality/value

The comprehensive risk assessment model is capable of assessing nine risk indicators, identifying three types of entities, workers, environment and machine on the construction site, presenting the integrated risk based on nine indicators. The proposed mechanism, which adopts expert knowledge through Building Information Modeling (BIM) safety simulation and extracts safety information based on computer vision, can perform a dynamic real-time risk analysis, categorize risks into five risk levels and provide potential suggestions to corresponding risk owners. The proposed mechanism can allow the project manager to take timely actions.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 July 2022

Ying Tao Chai and Ting-Kwei Wang

Defects in concrete surfaces are inevitably recurring during construction, which needs to be checked and accepted during construction and completion. Traditional manual inspection…

Abstract

Purpose

Defects in concrete surfaces are inevitably recurring during construction, which needs to be checked and accepted during construction and completion. Traditional manual inspection of surface defects requires inspectors to judge, evaluate and make decisions, which requires sufficient experience and is time-consuming and labor-intensive, and the expertise cannot be effectively preserved and transferred. In addition, the evaluation standards of different inspectors are not identical, which may lead to cause discrepancies in inspection results. Although computer vision can achieve defect recognition, there is a gap between the low-level semantics acquired by computer vision and the high-level semantics that humans understand from images. Therefore, computer vision and ontology are combined to achieve intelligent evaluation and decision-making and to bridge the above gap.

Design/methodology/approach

Combining ontology and computer vision, this paper establishes an evaluation and decision-making framework for concrete surface quality. By establishing concrete surface quality ontology model and defect identification quantification model, ontology reasoning technology is used to realize concrete surface quality evaluation and decision-making.

Findings

Computer vision can identify and quantify defects, obtain low-level image semantics, and ontology can structurally express expert knowledge in the field of defects. This proposed framework can automatically identify and quantify defects, and infer the causes, responsibility, severity and repair methods of defects. Through case analysis of various scenarios, the proposed evaluation and decision-making framework is feasible.

Originality/value

This paper establishes an evaluation and decision-making framework for concrete surface quality, so as to improve the standardization and intelligence of surface defect inspection and potentially provide reusable knowledge for inspecting concrete surface quality. The research results in this paper can be used to detect the concrete surface quality, reduce the subjectivity of evaluation and improve the inspection efficiency. In addition, the proposed framework enriches the application scenarios of ontology and computer vision, and to a certain extent bridges the gap between the image features extracted by computer vision and the information that people obtain from images.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 October 2018

Ting-Kwei Wang, David N. Ford, Heap-Yih Chong and Wei Zhang

Delays during construction are one of the common scenarios in the construction industry. The purpose of this paper is to identify the primary causes of delays in the construction…

1863

Abstract

Purpose

Delays during construction are one of the common scenarios in the construction industry. The purpose of this paper is to identify the primary causes of delays in the construction phase of building construction projects in China.

Design/methodology/approach

Questionnaire survey approach was adopted across the four typical cities in China, namely, Beijing, Shanghai, Chongqing and Shenzhen. In total, 115 sets of valid responded questionnaires were collected and analyzed.

Findings

The results show that the causes of variations, delays in progress payments, exceptionally low bids and subcontractors’ poor performance and communication issues were the most important causes of delays in China.

Originality/value

This research is the first questionnaire survey on the causes of delays in the construction phase of building construction projects in China. The comparative analysis shows two unique causes of delays in the Chinese construction industry, such as “difficulty in claiming indemnity” and “unreasonable upfront capital demanded by client.” It also reveals different ranked causes of delays as per distinguished political and economic situations in China. The research findings can be referred by construction projects in other countries that are funded or partnered with China.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 11
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596

1 – 6 of 6