Search results

1 – 4 of 4
Article
Publication date: 21 April 2022

Junwei Zheng, Yu Gu, Zhenduo Zhang, Hongtao Xie, Peikai Li and Hongyang Li

While existing literature emphasizes the importance of empowerment in construction projects, the working mechanisms of empowering leadership in the project context are unclear…

1322

Abstract

Purpose

While existing literature emphasizes the importance of empowerment in construction projects, the working mechanisms of empowering leadership in the project context are unclear. Based on conservation of resources (COR) theory, this study aimed to examine the relationship between empowering leadership and project performance, highlighting the mediation roles of creative self-efficacy and leadermember exchange and the moderation role of perceived overqualification.

Design/methodology/approach

The authors collected data from 287 project members in different projects and tested the integrated conceptual model through moderated mediation analysis with bootstrapping strategy.

Findings

The results revealed that empowering leadership was positively related to project performance through creative self-efficacy and leader–member exchange. Perceived overqualification served as significant moderator.

Originality/value

The findings contribute to the understanding of empowering leadership in projects by verifying and extending the resource acquisition and investment process in the project context. The results of this study also demonstrated that creative belief and social exchange facilitate the effectiveness of project members' task efforts and outcomes and that perceived overqualification might not exert a detrimental effect on project performance.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 November 2023

Junwei Zheng, Yu Gu, Peikai Li, Lan Luo and Guangdong Wu

The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project…

Abstract

Purpose

The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project leadership research over the last two decades. While several qualitative reviews have been conducted, there have been limited quantitative and systematic reviews on project leadership. This study fills this gap by portraying the knowledge landscape and tracking the evolution of project leadership research from 1998 to 2022 through bibliometric approaches.

Design/methodology/approach

Based on 816 records, including 793 articles extracted and selected from the Web of Science database and specific journals, and 23 articles selected from three non-SCI/SSCI indexed journals, the authors used CiteSpace and bibliometrix R-package to depict visualizations of the trajectory of co-cited references, the landscape of co-occurred keywords and emerging trends in project leadership via reference co-citation analysis, keyword co-occurrence analysis and thematic mapping.

Findings

The bibliometric analyses enabled the authors to understand the conceptual aspects of project leadership and its theoretical background. Three stages of the intellectual bases were identified and tracked: the infancy phase (1998–2007), the growth phase (2008–2014) and the new development phase (2015–2022). The results of keyword co-occurrence analysis indicated that the research focus evolved from investigating traits and competences to examining the effects of traditional leadership behaviors, and then considering context-specific leadership. The findings of thematic mapping and theoretical interpretation illustrate the potential directions of the competence comparison, new and appropriate leadership, and the interaction between leadership and context.

Originality/value

This study advanced the field by providing a systematic review of project leadership, developing potential future directions for project leadership research and providing practical implications for career development and training.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 January 2022

Jun Zhang, Yixuan Ma, Zongjin Ren, Tao Bai, Peikai Hu and Zunhao Wang

The purpose of this paper is to improve the reliability of the force measurement system by determining the reliable test range of dynamometer.

Abstract

Purpose

The purpose of this paper is to improve the reliability of the force measurement system by determining the reliable test range of dynamometer.

Design/methodology/approach

Based on the principle of leverage and moment balance, a general force distribution model is applicable in where the test point is located either inside or outside the support region of four three-component force links of dynamometer is established. After corroborating the correctness of the model through verification experiments, the boundary conditions that each three-component force link should satisfy are analyzed by considering the characteristic of the dynamometer components comprehensively. Furthermore, the reliable test range of dynamometer is determined, followed by a calibration experiment to verify its rationality.

Findings

The relationships between the reliable test range and the tested force, the bolt pre-tightening force and the bearing capacity of quartz wafers are clarified. Further, the experimental calibration results show that when the test point is within the reliable test range, the three-directional output voltage of dynamometer has excellent linearity and repeatability. The nonlinearity and repeatability in X-, Y- and Z-directions are all less than 1.1%.

Originality/value

A general mathematical model of force distribution of four three-component force links is constructed, which provides a theoretical basic for the mechanical analysis of multi-sensors’ dynamometer. Comprehensively considering the performance of dynamometer components, the value of measured force and the pre-tightening force, the simultaneous equations of reliable test range are deduced, which limits the boundary of allowable test position of piezoelectric dynamometer.

Details

Sensor Review, vol. 42 no. 2
Type: Research Article
ISSN: 0260-2288

Keywords

Article
Publication date: 26 April 2022

Qi Zhang, Shengyue Hao and Kon Shing Kenneth Chung

A project manager’s (PM) emotional intelligence (EI) is essential for project performance (PP). However, the cause and effect and the potential moderators of the relationship…

1305

Abstract

Purpose

A project manager’s (PM) emotional intelligence (EI) is essential for project performance (PP). However, the cause and effect and the potential moderators of the relationship between EI and PP remain disputed. Some scholars found a positive association between PMs’ EI and project outcomes, while some other studies showed non or negative relation. This paper aims to find the relationship between PMs’ EI and PP and the factors that influence this relationship based on diverse prior research.

Design/methodology/approach

This paper conducts a meta-analysis of 5,229 observations based on 24 independent studies from 1990 to 2021.

Findings

Results show that PMs’ EI has a significant positive influence on PP, and the project complexity and measurement of PP are two critical moderators explaining inconsistencies in existing research.

Practical implications

The current study proposes suggestions for construction companies on PMs’ selection and training. This study also offers suggestions for PMs in management practice.

Originality/value

To the best of the authors’ knowledge, this study is the first to explore the inconsistencies in prior research results on the relationship between PMs’ EI and PP at the meta-analytic level. This research extends the current literature by revealing the factors leading to existing consistencies that are not explored before. This study implies that the meta-analysis method could help reach a balanced conclusion based on inconsistent results.

Details

Chinese Management Studies, vol. 17 no. 3
Type: Research Article
ISSN: 1750-614X

Keywords

1 – 4 of 4