Search results

1 – 10 of 101
Article
Publication date: 3 April 2023

Qiang Du, Xiaomin Qi, Patrick X.W. Zou and Yanmin Zhang

The purpose of this paper is to develop a bi-objective optimization framework to select prefabricated construction service composition. An improved algorithm-genetic simulated…

Abstract

Purpose

The purpose of this paper is to develop a bi-objective optimization framework to select prefabricated construction service composition. An improved algorithm-genetic simulated annealing algorithm (GSA) is employed to demonstrate the application of the framework.

Design/methodology/approach

The weighted aggregate multi-dimensional collaborative relationship is used to quantitatively evaluate the synergistic effect. The quality of service is measured using the same method. The research proposed a service combination selection framework of prefabricated construction that comprehensively considers the quality of service and synergistic effect. The framework is demonstrated by using a GSA that can accept poor solutions with a certain probability. Furthermore, GSA is compared with the genetic algorithm (GA), simulated annealing algorithm (SA) and particle swarm optimization algorithm (PSO) to validate the performance.

Findings

The results indicated that GSA has the largest optimal fitness value and synergistic effect compared with other algorithms, and the convergence time and convergence iteration of the improved algorithm are generally at a low level.

Originality/value

The contribution of this study is that the proposed framework enables project managers to clarify the interactions of the prefabricated construction process and provides guidance for project collaborative management. In addition, GSA helps to improve the probability of successful collaboration between potential partners, therefore enhancing client satisfaction.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 January 2023

Sheng Xu, Linfeng Zhou and Patrick X.W. Zou

The quality liability of prefabricated components (PCs) is a major issue among key stakeholders. The blockchain-based quality tracking systems are supposed to support a more…

Abstract

Purpose

The quality liability of prefabricated components (PCs) is a major issue among key stakeholders. The blockchain-based quality tracking systems are supposed to support a more transparent and trusting quality control process. However, many factors affect the stakeholders' willingness toward the adoption of such quality tracking systems. The purpose of this research is to investigate the key factors that influence the stakeholders' adoption decisions toward the application of the quality tracking system in PCs and develop coping strategies.

Design/methodology/approach

An evolutionary game model is established that includes the manufacturer, constructor and developer. Four scenarios of equilibriums and the game's evolutionary stable strategies are analyzed, and the corresponding stability conditions are then obtained. Based on the tripartite game model, two representative projects are used as case studies to simulate how different factors affect the stakeholders' decisions.

Findings

First, trade-offs between cost and benefits were the most prominent factor in the adoption decision-making. Second, the advancement of technologies would compensate for their immaturity. Third, subsidy and penalty provision of the developer and high-level trust both incentivize the stakeholders to adopt the quality tracking systems.

Originality/value

This research investigates the influence of technology, environment and participant related factors on the adoption decisions of the quality tracking system for PCs and discovered that technology maturity and advancement played an essential role. It is expected that the research findings would be of value to policy makers and project management personnel for better quality control of prefabricated construction.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 January 2023

Xiaomin Qi, Qiang Du, Patrick X.W. Zou and Ning Huang

The purpose of this paper is to develop a model considering synergy effect for prefabricated construction service combination selection.

152

Abstract

Purpose

The purpose of this paper is to develop a model considering synergy effect for prefabricated construction service combination selection.

Design/methodology/approach

This research defines prefabricated construction service as a service-led construction method that meets the specific requirements of clients. Based on network theory, the multi-dimensional collaborative relationships of the prefabricated construction inter-services are formulated. The synergy effect is quantitatively calculated through the linear weighting of the strengths of collaborative relationships. Further, a weighted synergy network (WSN) is developed, from which a service composition selection model considering the synergy effect is established. Then, a genetic algorithm is employed to implement the model.

Findings

The results showed that (1) when the number of prefabricated construction services is increased, the synergy effect of combination options is enhanced; (2) The finer-grained prefabricated construction services, the stronger the synergy effect of service combination; (3) Clients have heterogeneous preferences for collaborative relationships, and there are differences in the synergy effect of service combination.

Originality/value

The contribution of this research includes proposed a method to quantify the synergy effect from the perspective of collaborative relationships, explored the specific procedure for the prefabricated construction service combination selection under the service-led construction, and provided a reference for promoting the development in construction. Besides, the model proposed could be applied to prefabricated construction service composition selection with diverse research boundaries or client preferences by executing the same procedure.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 November 2022

Ning Huang, Qiang Du, Patrick X.W. Zou and Youdan Huang

This study aims to analyze the interaction and key factors within the network of factors influencing the success of green highway projects.

294

Abstract

Purpose

This study aims to analyze the interaction and key factors within the network of factors influencing the success of green highway projects.

Design/methodology/approach

Through literature review and interviews with experienced project managers, this study identified 33 influencing factors from the perspectives of stakeholders and life cycle. The interaction between these influencing factors was determined by surveying different experts, most of whom have participated in green highway projects in China. Then, social network analysis (SNA) was used to explore the impact and control ability of different factors.

Findings

According to the prioritization of these factors, the results showed that some key factors were identified, especially incremental cost, lack of standards and regulations, development of innovative technologies and materials, public awareness and environmental protection behavior. Finally, some meaningful suggestions were put forward for different influencing factors of green highway projects.

Research limitations/implications

While the key influencing factors of the green highway projects have been identified by considering the interrelationships between different factors, the specific influencing paths and levels of different factors are not analyzed, more studies and methods should be conducted on this area in the future.

Practical implications

This finding of factors influencing the success of green highway projects which is useful for managers to overcome various obstacles encountered in similar projects. Moreover, considering the interaction among the influencing factors enables managers to make systematic and efficient decisions.

Social implications

Developing green highways have been perceived as a major innovation to help achieve the synergy of environmental protection, economic development and social responsibility. Studying the key factors influencing the success of green highway projects and putting forward targeted suggestions are crucial for promoting the environmental protection transformation of highway construction.

Originality/value

Compared with most studies on the identification of key influencing factors of construction projects, this research emphasized the interaction between different factors within the system in the analysis process. The findings could provide useful references to promote the successful implementation of green highway projects.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 June 2007

Patrick X.W. Zou, Dongping Fang, Shou Qing Wang and Martin Loosemore

This paper aims to provide useful information and suggestions for future improvement in relation to China's construction industry and market. With China's rapid economical…

3179

Abstract

Purpose

This paper aims to provide useful information and suggestions for future improvement in relation to China's construction industry and market. With China's rapid economical development and its entry to the World Trade Organization (WTO), much attention has been paid to the China construction business opportunities. However, not much information is available on the history, practices and business cultures of the Chinese construction industry.

Design/methodology/approach

Through literature review and interviews with industry professionals, this paper discusses the Chinese construction industry in terms of its market and management practice with a focus on tendering processes, contract management, project on‐site supervision and occupational health and safety (OHS) issues. It also discusses the challenges that face the Chinese construction industry.

Findings

China has gone over a long way in construction tendering, contract management and OHS. Its current practice is in the right direction. However, further development and improvements are necessary.

Originality/value

This paper provides useful information to Chinese construction personnel for future improvement. This paper also provides useful information to overseas companies who are planning to enter China's construction market in the near future.

Details

Journal of Technology Management in China, vol. 2 no. 2
Type: Research Article
ISSN: 1746-8779

Keywords

Article
Publication date: 15 February 2013

Arshad Ali Javed, Patrick T.I. Lam and Patrick X.W. Zou

The purpose of this paper is to focus on the challenges faced by the public and private sectors in developing output specifications for Australian public private partnership (PPP…

2404

Abstract

Purpose

The purpose of this paper is to focus on the challenges faced by the public and private sectors in developing output specifications for Australian public private partnership (PPP) projects. In particular, this study aims to examine how the stakeholders (including facilities managers) should cater for future changes in output specifications and make them flexible enough to meet the evolving project objectives.

Design/methodology/approach

The research is based on 19 semi‐structured interviews with key stakeholders from the public and private sectors in three States of Australia where PPP procurement has been used, including New South Wales (NSW), Queensland and Victoria. The results are triangulated with relevant literature for supports and contrasts.

Findings

For PPP projects, a good set of output specifications is conducive to the achievement of value for money, innovation, risk transfer, whole life asset performance through a clear abatement regime and an effective linkage of performance criteria to the payment mechanism. For existing specifications, it was found that too many and complex KPIs were specified, which were difficult to monitor, measure and implement by the client. Very prescriptive specifications hindered innovations and did not allow appropriate risk allocation. Further, the research study suggests that after the global financial crises, the private sector had less appetite to take the patronage risks in road and rail PPP projects. To mitigate these pitfalls, it is imperative that output specifications need to be aligned with the type of PPP projects they represent; in particular foreseeable changes should be addressed by some pre‐agreed framework to facilitate negotiation.

Originality/value

The significant contribution of this research is the identification of the common issues faced in drafting output specifications for Australian PPP projects. Stakeholders of future PPP projects should find the lessons useful for achieving value for money and appropriate risk transfer, stating the user requirements through clear and concise output specifications rather than input or prescriptive specifications in procuring social and economical PPP projects. Their relationships with facilities management are highlighted.

Article
Publication date: 28 October 2014

Patrick X.W. Zou and Rebecca J. Yang

This paper aims to investigate residential occupants’ motivations and behaviour on energy savings. Energy consumption in residential buildings is a major contributor to greenhouse…

1199

Abstract

Purpose

This paper aims to investigate residential occupants’ motivations and behaviour on energy savings. Energy consumption in residential buildings is a major contributor to greenhouse gas emissions.

Design/methodology/approach

By using an online survey questionnaire instrument, this research collected 504 sets of responses from households in the state of New South Wales, Australia.

Findings

Through statistical analysis of the data collected, this research found that construction cost and government incentive were considered as the major influencing factors on achieving energy-efficient residential building development, and the lower bills resulted from the reduced energy and water consumption were considered as the most important benefits. The research also found that many households exhibited a high level of awareness and had implemented some sustainability improvement measures. It is suggested, based on these research findings, that governments should articulate, by means of education, the rationale and benefits of sustainable home development that are identified in this research and reduce material costs and increase government incentives.

Originality/value

A framework on improving residential sustainability was proposed in this paper. Stakeholders in the sustainable home supply chain could use this framework as a reference to pave the way for energy efficient home development from their perspective

Details

International Journal of Energy Sector Management, vol. 8 no. 4
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 26 September 2008

Patrick X.W. Zou and Alison Wong

The aims of this research are to identify the opportunities and risks and develop effective business strategies for foreign design and construction management companies to…

1439

Abstract

Purpose

The aims of this research are to identify the opportunities and risks and develop effective business strategies for foreign design and construction management companies to penetrate into the Chinese market.

Design/methodology/approach

Ten interviews with directors of design, construction and engineering firms who are operating in China were carried out. It also include a literature review.

Findings

The results show that the interviewees were very optimistic about the China market and believed that establishing wholly foreign‐owned enterprises was the most effective entry mode. The research also found that “differentiation strategy by providing niche or superior products or services” is the fundamental and best strategy for penetrating into China market. In addition, the research found that the foreign companies must cultivate a network of contacts (i.e. Guanxi) and be culturally adaptive to have a competitive advantage in China.

Originality/value

this paper is original in that it provides insight from the first hand face‐to‐face interviews who have been operating successfully in the Chinese market. With the entry to the World Trade Organisation (WTO) and its rapid economy growth, China presents the world enormous opportunities virtually in every industry sector including the design, and construction industry. Due to the complex and dynamic nature of the Chinese market, there are risks associated with these opportunities. The foreign companies entering into China market must develop capability to assess the opportunities, analyse the risks, and make informed decisions concerning market entry mode and business development strategies.

Details

Journal of Technology Management in China, vol. 3 no. 3
Type: Research Article
ISSN: 1746-8779

Keywords

Article
Publication date: 22 August 2008

Patrick X.W. Zou, Shouqing Wang and Dongping Fang

The purpose of this paper is to develop a life cycle risk management framework for public private partnership (PPP) infrastructure projects that lead to the realization of value…

8895

Abstract

Purpose

The purpose of this paper is to develop a life cycle risk management framework for public private partnership (PPP) infrastructure projects that lead to the realization of value for money and balance of interests between different partners including the public and end users.

Design/methodology/approach

This paper draws on extensive theoretical research and literature reviews, coupled with case study methodologies. A comprehensive review of current literature in the field was first carried out. Then three PPP infrastructure projects, two from Australia and one from China, are studied to scrutinize reasons leading to their dilemma and articulate the valuable lessons learnt in relation to risk analysis and mitigation.

Findings

The paper found that properly assessing risks (financial, government's political and public's acceptance/rejection risks), ensuring value for money and protecting the public (and end users') interests are essential in PPP infrastructure projects and this can only be achieved through optimal risk identification, assessment, allocation and management from a life cycle perspective and balanced interests between the Government/public and private partners as well as product end users.

Research limitations/implications

The paper was limited to proposing the framework; therefore the next step should be testing the framework.

Practical implications

The framework proposed in this paper should be practical and useful for professionals in managing the risks associated with the procurement of PPP infrastructure projects.

Originality/value

The PPP method has been increasingly used to procure large‐scale infrastructures such as freeways, railways, tunnels and bridges worldwide. While there have been many successful PPP projects, unsuccessful cases abound and studying them can help people better manage the risks in future PPP infrastructure projects. To ensure the success of PPP infrastructure projects, it is important for all partners to manage the risks from a project life cycle perspective, in which risks are identified and assessed in the earliest possible project stage and are allocated to the parties who are in the best position to control them. Furthermore, it is also important to continuous monitor the risks and develop proactive risk respond strategies throughout the project life cycle. To this end, this paper provides a life‐cycle risk management framework for PPP infrastructure projects.

Details

Journal of Financial Management of Property and Construction, vol. 13 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 2 December 2021

Sheng Xu, Mengge Zhang, Bo Xia and Jiangbo Liu

This study aimed to identify driving factors of safety attitudinal ambivalence (AA) and explore their influence. Construction workers' intention to act safely can be instable…

Abstract

Purpose

This study aimed to identify driving factors of safety attitudinal ambivalence (AA) and explore their influence. Construction workers' intention to act safely can be instable under conflicting information from safety management, co-workers and habitual unsafe behaviour. Existing research explained the mechanism of unsafe behaviours as individual decisions but failed to include AA, as the co-existence of both positive and negative attitude.

Design/methodology/approach

This study applied system dynamics to explore factors of construction workers' AA and simulate the process of mitigating the ambivalence for less safety behaviour. Specifically, the group model building approach with eight experts was used to map the causal loop diagram and field questionnaire of 209 construction workers were used to collect empirical data for initiating parameters.

Findings

The group model building identified five direct factors of AA, namely the organisational safety support, important others' safety attitude, emotional arousal, safety production experience and work pressure, with seven feedback paths. The questionnaire survey obtained the initial values of the factors in the SD model, with the average ambivalence at 0.389. The ambivalence between cognitive and affective safety attitude was the highest. Model simulation results indicated that safety experience and work pressure had the most significant effects, and safety experience and positive attitude of co-workers could compensate the pressure from tight schedule and budget.

Originality/value

This study provided a new perspective of the dynamic safety attitude under the co-existence of positive and negative attitude, identified its driving factors and their influencing paths. The group model building approach and field questionnaire surveys were used to provide convincible suggestions for empirical safety management with least and most effective approaches and possible interventions to prevent unsafe behaviour with tight schedule and budget.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 101