Article
Publication date: 27 June 2023

Olubukola Tokede, Mani Kumar Boggavarapu and Sam Wamuziri

Crucial transition of the Indian residential building sector into a low-emission economy require an in-depth understanding of the potentials for retrofitting the existing building…

Abstract

Purpose

Crucial transition of the Indian residential building sector into a low-emission economy require an in-depth understanding of the potentials for retrofitting the existing building stock. There are, however, limited studies that have recognised the interdependencies and trade-offs in the embodied energy and life cycle impact assessment of retrofit interventions. This research appraises the life cycle assessment and embodied energy output of a residential building in India to assess the environmental implications of selected retrofit scenarios.

Design/methodology/approach

This study utilises a single case study building project in South India to assess the effectiveness and impact of three retrofit scenarios based on life cycle assessment (LCA) and embodied energy (EE) estimates. The LCA was conducted using SimaPro version 9.3 and with background data from Ecoinvent database version 3.81. The EE estimates were calculated using material coefficients from relevant databases in the published literature. Monte Carlo Simulation is then used to allow for uncertainties in the estimates for the scenarios.

Findings

The three key findings that materialized from the study are as follows: (1) the retrofitting of Indian residential buildings could achieve up to 20% reduction in the life cycle energy emissions, (2) the modification of the building envelope and upgrading of the building service systems could suffice in providing optimum operational energy savings, if the electricity from the grid is sourced from renewable plants, and (3) the production of LEDs and other building services systems has the highest environmental impacts across a suite of LCA indicators.

Originality/value

The retrofitting of residential buildings in India will lead to better and improved opportunities to meet the commitments in the Paris Climate Change Agreement and will lead to enhanced savings for building owners.

Details

Built Environment Project and Asset Management, vol. 13 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 31 January 2024

Olubukola Tokede and Anastasia Globa

This paper bridges the gap between the theory and practice by developing a life cycle sustainability tracker (LCST). The study is seeking to proffer solutions to an observed…

102

Abstract

Purpose

This paper bridges the gap between the theory and practice by developing a life cycle sustainability tracker (LCST). The study is seeking to proffer solutions to an observed shortcoming of conventional life cycle sustainability assessment (LCSA) communication platforms. Notably, the static nature of the information provided on such platforms has made it difficult for them to be used for real-time decision-making and predictions. The main aim of this paper is to develop a LCST that facilitates a dynamic visualisation of life cycle sustainability results and allows for an integrated benchmark across the dimensions of sustainability.

Design/methodology/approach

The study leverages the model development capabilities of the design science research strategy in accomplishing a dynamic and novel communication platform. A life cycle thinking methodology and appropriate multicriteria decision approach (MCDA) is applied to accomplish a comprehensive, streamlined and replicable approach in mapping and tracking the progress of sustainable development goals (SDGs) in the National Infrastructure Pipeline (NIP) projects in India.

Findings

It was found that: (1) The use of the LCST tracker provides a dynamic and holistic insight into the key LCSA indicators with clearly defined benchmarks to assess the impact on the SDG 11, (2) The NIP projects achieve an upward trend across all the regions, and the percentage of opportunities ranges from 11 to 24%, with the South experiencing the highest growth and the North having the minimal increase in percentage and (3) The assessment score (52–58%) provides performance metrics that align well with the LCST – which ranges between “Fair” and “Average” for all the regions in India.

Originality/value

The novelty of this research is that the LCST provides a transparent and harmonised approach to reporting on the LCSA results. The LCST utilises heat maps and radial mapping to achieve an intuitive display of large amounts of highly heterogeneous data, thus allowing the synthesis of large sets of information compactly and with coherence. Progress towards the SDGs change on a yearly basis; hence, a dynamic LCSA tool provides a timely and the valuable context to map and track performance across different regions and contexts.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 February 2018

Olubukola Tokede, Nilupa Udawatta and Mark Luther

Heritage buildings are a crucial part of the UK built sector. They perpetuate a sense of identity, prestige and community. Many heritage buildings however tend to be energy…

Abstract

Purpose

Heritage buildings are a crucial part of the UK built sector. They perpetuate a sense of identity, prestige and community. Many heritage buildings however tend to be energy inefficient and the scope for retrofitting such buildings is paramount. Heritage buildings require ratification from planning bodies in order to undertake any alteration on the building. This tends to create a bottleneck in the retrofitting of heritage office buildings. The paper aims to discuss this issue.

Design/methodology/approach

This study utilises a case study building in Scotland to evaluate the potential for retrofitting in a UK heritage office building. Building energy simulation software is used to generate the energy data in different retrofit options. A scenario analysis on the heritage status of the building is also undertaken.

Findings

The costs, energy consumption and carbon emission levels are evaluated and compared. It was found that the differential in annual energy savings achieved, based on the proportion of capital cost to operational cost, is 14.6 per cent in the heritage building, compared to 24.6 per cent in the non-heritage building.

Originality/value

The study suggests that government and other stakeholders should seek for ways of incentivising retrofit investments in heritage buildings. This will provide an effective way of minimising the contributions of the built environment to global warming and climate change.

Details

Built Environment Project and Asset Management, vol. 8 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 26 January 2022

Olubukola Tokede, Dominic Ahiaga-Dagbui and John Morrison

Critical knowledge and lessons learnt from the delivery of infrastructure projects have often remained untapped mainly due to the transient and fragmented nature of construction…

Abstract

Purpose

Critical knowledge and lessons learnt from the delivery of infrastructure projects have often remained untapped mainly due to the transient and fragmented nature of construction delivery. The main aim of this paper is to investigate the mediating role of a project facilitator in attenuating disruptions in knowledge flows during the delivery of an infrastructure project.

Design/methodology/approach

An inductive case-study method is employed in examining the mediating role of the facilitator in an infrastructure project. Content analysis was undertaken by coding the data derived from eight focus group interactions, 23 semi-structured interviews and 24 documentary sources from workshops using NVivo 12 plus.

Findings

(1) The project facilitator provided a coherent context to re-invent the narratives (i.e. behaviours and events) by creating a forum for understanding critical problems and stimulating constructive dialogue and intervention. (2) The project facilitator leveraged on both explicit and tacit knowledge within the team, leading to improvement in the proactive management of emergent technical, operational and behavioural challenges, and (3) The project facilitator sustained a valuable intervention in attenuating disruptions in knowledge flows for problem-solving, relationship-management, best-practice strategies, coaching and leadership, as well as reflexive practice.

Originality/value

The novelty of this research is that a facilitator is used as the “knowledge-broker” in a multi-party infrastructure delivery team assembled using a traditional lump-sum contract framework. Facilitators have only previously been used in collaborative contract environments like alliancing and partnering.

Details

International Journal of Managing Projects in Business, vol. 15 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 7 July 2020

Dominic D. Ahiaga-Dagbui, Olubukola Tokede, John Morrison and Anthony Chirnside

Effective inter-organisational relationships are key to engendering innovation and ensuring the successful delivery of infrastructure projects. Relationship-based contracts are…

2315

Abstract

Purpose

Effective inter-organisational relationships are key to engendering innovation and ensuring the successful delivery of infrastructure projects. Relationship-based contracts are thus widely used to stimulate best-for-project ideals and attenuate the otherwise adversarial relationship that often exists between clients and contractors. This study examines the effectiveness and limitations of a project facilitation model as coaching tool for developing conducive inter-organisational relationships for construction project delivery.

Design/methodology/approach

The study adopts a case-study approach using evidence from triangulated data sources of focus group workshops, semi-structured interviews and document analysis.

Findings

(1) The facilitation model enabled an environment for psychological safety to be developed, which engendered a platform for effective cooperation for problem-solving and achieving quasi best-for-project ideals. (2) The model provides the mechanism to develop team behaviours that support enhanced performance and create an environment less adversarial and more collaborative than traditional contracting.

Originality/value

The novelty of this research is that relationship-based principles have been utilised as part of a traditional design-bid-build contract with lump-sum payment arrangements.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 5 October 2018

Olubukola Tokede, Adam Ayinla and Sam Wamuziri

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different…

Abstract

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different concept selection methods that were considered for drilling operations at the Trym field in Norway. The construction of drilling rigs is a capital-intensive process, and it involves high levels of economic risk. These risks can be broadly categorised as aleatoric (i.e. those related to chance) and epistemic (i.e. those related to knowledge). Evaluating risks in the investment appraisal process tends to be a complicated process. Project risks are evaluated using Monte Carlo simulation (MCS) and are based on the fuzzy analytic hierarchy process (AHP). MCS provides a useful means of evaluating variabilities (i.e. aleatoric risks) in oil drilling operations. However, many of the economic risks in oil drilling processes are unanticipated, and, in some cases, are not readily expressible in quantitative values. The fuzzy AHP is therefore used to appraise the qualitatively defined indirect revenues comprising risks that affect future flexibilities, schedule certainty and health and safety performance. Both the Monte Carlo technique and the fuzzy AHP technique found that a cumulative revenue variation of up to 30% is possible in any of the considered drilling options. The fuzzy AHP technique estimates that the chances of profitability being less than NOK 1 billion over a five-year period is 0.5%, while the Monte Carlo technique estimates suggest a more conservative proportion of 10%. Overall, the fuzzy AHP technique is easy to use and flexible, and it demonstrates increased robustness and improved predictability.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Article
Publication date: 7 April 2014

Brian Sloan, Olubukola Tokede, Sam Wamuziri and Andrew Brown

The main purpose of the study is to promote consideration of the issues and approaches available for costing sustainable buildings with a view to minimising cost overruns…

2238

Abstract

Purpose

The main purpose of the study is to promote consideration of the issues and approaches available for costing sustainable buildings with a view to minimising cost overruns, occasioned by conservative whole-life cost estimates. The paper primarily looks at the impact of adopting continuity in whole-life cost models for zero carbon houses.

Design/methodology/approach

The study embraces a mathematically based risk procedure based on the binomial theorem for analysing the cost implication of the Lighthouse zero-carbon house project. A practical application of the continuous whole-life cost model is developed and results are compared with existing whole-life cost techniques using finite element methods and Monte Carlo analysis.

Findings

With standard whole-life costing, discounted present-value analysis tends to underestimate the cost of a project. Adopting continuity in whole-life cost models presents a clearer picture and profile of the economic realities and decision-choices confronting clients and policy-makers. It also expands the informative scope on the costs of zero-carbon housing projects.

Research limitations/implications

A primary limitation in this work is its focus on just one property type as the unit of analysis. This research is also limited in its consideration of initial and running cost categories only. The capital cost figures for the Lighthouse are indicative rather than definitive.

Practical implications

The continuous whole-life cost technique is a novel and innovative approach in financial appraisal […] Benefits of an improved costing framework will be far-reaching in establishing effective policies aimed at client acceptance and optimally performing supply chain networks.

Originality/value

The continuous whole-life costing pioneers an experimental departure from the stereo-typical discounting mechanism in standard whole-life costing procedures.

Details

Journal of Financial Management of Property and Construction, vol. 19 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Content available
Book part
Publication date: 5 October 2018

Abstract

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Abstract

Details

International Journal of Managing Projects in Business, vol. 15 no. 4
Type: Research Article
ISSN: 1753-8378