Article
Publication date: 6 February 2023

G. Edward Gibson, Mounir El Asmar, Abdulrahman Yussef and David Ramsey

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule…

173

Abstract

Purpose

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions. A framework to measure FEED accuracy does not exist in the literature or in practice, not does systematic data directly linking FEED accuracy to project performance. This paper aims to focus first on gauging and quantifying FEED accuracy, and second on measuring its impact on project performance in terms of cost change, schedule change, change performance, financial performance and customer satisfaction.

Design/methodology/approach

A novel measurement scheme was developed for FEED accuracy as a comprehensive assessment of factors related to the project leadership and execution teams, management processes and resources; to assess the environment surrounding FEED. The development of this framework built on a literature review and focus groups, and used the research charrettes methodology, guided by a research team of 20 industry professionals and input from 48 practitioners representing 31 organizations. Data were collected from 33 large industrial projects representing over $8.8 billion of installed cost, allowing for a statistical analysis of the framework's impact on performance.

Findings

This paper describes: (1) twenty-seven critical FEED accuracy factors; (2) an objective and scalable method to measure FEED accuracy; and (3) data showing that projects with high FEED accuracy outperformed projects with low FEED accuracy by 20 percent in terms of cost growth in relation to their approved budgets.

Practical implications

FEED accuracy is defined as the degree of confidence in the measured level of maturity of the FEED deliverables to serve as a basis of decision at the end of detailed scope, prior to detailed design. Assessing FEED accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions.

Originality/value

FEED accuracy has not been assessed before, and it turned out to have considerable project performance implications. The new framework presented in this paper is the first of its kind, it has been tested rigorously, and it contributes to both the literature body of knowledge as well as to practice. As one industry leader recently stated, “it not only helped to assess the quality and adequacy of the technical documentation required, but also provided an opportunity to check the organization's readiness before making a capital investment decision.”

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 February 2019

Farook Hamzeh, Farid Rached, Youssef Hraoui, Antoine Joseph Karam, Zeina Malaeb, Mounir El Asmar and Yara Abbas

This study investigates the extent to which the popular forms of contract adopted in the Middle East (ME) address collaboration. The purpose of this paper is to assess how…

1202

Abstract

Purpose

This study investigates the extent to which the popular forms of contract adopted in the Middle East (ME) address collaboration. The purpose of this paper is to assess how collaboration features weaved into the construct of integrated project delivery (IPD) may impact projects in the ME. In this context, the study identifies features in IPD and existing delivery methods that may enable or inhibit collaboration and evaluates their impact on project success from the perspective of various contract managers in the ME.

Design/methodology/approach

The study employs structured face-to-face interviews with 41 construction industry practitioners in top contract management positions in the ME to evaluate the significance of collaboration features in IPD. Data collected from the structured interviews/surveys were analyzed using statistical tools in R and Excel.

Findings

Results reveal that while experts recognize the collaboration benefits which IPD features may contribute to a project, the current contractual environment of the industry does not optimally encompass these features. The current status of project delivery does not favor IPD implementation nor does it enable its collaborative features.

Originality/value

This study contributes to the growing international body of knowledge addressing the application of collaborative contracts in construction projects, and it is innovative in evaluating collaboration features within IPD and exiting project deliveries in the ME.

Details

Built Environment Project and Asset Management, vol. 9 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 6 November 2019

Jeffrey Feghaly, Mounir El Asmar, Samuel Ariaratnam and Wylie Bearup

The purpose of this paper is to identify key project delivery method selection factors to assist water industry decision-makers in selecting the most appropriate delivery method…

511

Abstract

Purpose

The purpose of this paper is to identify key project delivery method selection factors to assist water industry decision-makers in selecting the most appropriate delivery method for their water treatment plant projects.

Design/methodology/approach

The selection factors were identified by compiling and validating key project delivery selection factors across various industries through an extensive literature review and two industry expert workshops. This resulted in the development of a web-based decision-support tool to facilitate project delivery method selection within the water industry.

Findings

The research effort led to the identification of 13 key project delivery method selection factors (seven primary factors and six secondary factors) for water treatment plant projects. These factors were utilized to develop EXPRSS-TP, a pioneering web-based project delivery method decision-support tool for the water industry.

Practical implications

A project delivery method selection process is typically an informal process that may range from days to weeks at a time. Based on this work, the assessment can now be completed in about one hour and provides decision-makers with the most favorable delivery method for their project. And with the new tool that encompasses the new knowledge, not only is the decision reached at an accelerated pace, EXPRSS-TP also documents the entire selection process, allowing for a written and retained record of this key decision and its procedure.

Originality/value

This paper contributes to the exisiting body of knowledge by identifying key project delivery selection factors across numerous industries, assessing and combining them, and finally incorporating them into one comprehensive process. EXPRSS-TP improves the traditional project delivery method selection process and provides evidence-based project delivery method selection recommendations.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

1040

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 20 September 2022

Vassiliki Demetracopoulou, William J. O'Brien, Nabeel Khwaja, Jeffrey Feghaly and Mounir El Asmar

Over the last three decades, construction projects have increasingly been delivered through alternative delivery methods. As a result, many owners have a range of delivery methods…

Abstract

Purpose

Over the last three decades, construction projects have increasingly been delivered through alternative delivery methods. As a result, many owners have a range of delivery methods to choose from and aim to use the right one for each of their projects. Researchers have developed several tools and decision-support processes to facilitate this selection procedure. The purpose of this study is to review and discuss differences and common themes across selection tools developed by academic researchers and project owners.

Design/methodology/approach

The study reviews prominent selection processes and tools used for infrastructure projects by conducting an in-depth literature review and using the content analysis method to elicit findings on the methodologies and criteria presented in the literature.

Findings

This study presents three principal findings. First, findings show three common themes emerge within the selection criteria—characteristics, goals and risks. Second, while academic studies most commonly suggest employing multi-attribute analysis, this study reveals that, in practice, selection tools most frequently employ a staged or gated evaluation based on the type of criteria and their importance to the decision. Finally, this review further highlights the importance of institutional context in decision-making.

Originality/value

This work contributes to the body of knowledge by providing guidance to practitioners and opening new directions for researchers around the way selection criteria are categorized in the relevant literature and the institutional context considerations when structuring or evaluating a selection process or tool.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 June 2022

Sara Rankohi, Mario Bourgault and Ivanka Iordanova

Integrated project delivery (IPD) has attracted considerable attention in recent years, however only a few review studies captured the dynamic and evolving nature of this topic…

Abstract

Purpose

Integrated project delivery (IPD) has attracted considerable attention in recent years, however only a few review studies captured the dynamic and evolving nature of this topic. The purpose of this study is to review the most recent IPD publications, in order to shed light on future research.

Design/methodology/approach

Using a systematic review methodology, the study aims to synthesize the current IPD literature, and frame the latest research and development in this domain. A systematic review is conducted to identify the current state-of-the-art of IPD research and the latest research themes and trends in this domain. A bibliometric analysis is performed to explain characteristics of screened articles, and through a thematic analysis the latest themes and trends are recognized.

Findings

In this study, based on IPD characteristics (contractual-regulative, operational-cognitive and organizational-structural), research themes (legal, commercial, technological, procedural, cultural and structural), sub-themes and their associated trends are identified. The latest emerging trends are mostly related to the contractual characteristics of IPD, and are focused on the combination of IPD with new business models and developing contractual guidelines for promoting IPD applications in off-site and on-site construction projects.

Originality/value

This research contributes to the body of knowledge by synthesizing the state of the art of IPD in construction literature and exposing the latest research trends in this area. A theoretical framework of integration in an IPD context is developed, based on the literature. Finally, future areas of studies are discussed.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords