Book part
Publication date: 5 October 2018

Nasir Bedewi Siraj, Aminah Robinson Fayek and Mohamed M. G. Elbarkouky

Most decision-making problems in construction are complex and difficult to solve, as they involve multiple criteria and multiple decision makers in addition to subjective…

Abstract

Most decision-making problems in construction are complex and difficult to solve, as they involve multiple criteria and multiple decision makers in addition to subjective uncertainties, imprecisions and vagueness surrounding the decision-making process. In many instances, the decision-making process is based on linguistic terms rather than numerical values. Hence, structured fuzzy consensus-reaching processes and fuzzy aggregation methods are instrumental in multi-criteria group decision-making (MCGDM) problems for capturing the point of view of a group of experts. This chapter outlines different fuzzy consensus-reaching processes and fuzzy aggregation methods. It presents the background of the basic theory and formulation of these processes and methods, as well as numerical examples that illustrate their theory and formulation. Application areas of fuzzy consensus reaching and fuzzy aggregation in the construction domain are identified, and an overview of previously developed frameworks for fuzzy consensus reaching and fuzzy aggregation is provided. Finally, areas for future work are presented that highlight emerging trends and the imminent needs of fuzzy consensus reaching and fuzzy aggregation in the construction domain.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Content available
Book part
Publication date: 5 October 2018

Abstract

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Article
Publication date: 1 June 2021

Okechukwu Bruno-Kizito Nwadigo, Nicola Naismith, Ali GhaffarianHoseini, Amirhosein GhaffarianHoseini and John Tookey

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to…

Abstract

Purpose

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to explore secondary data from previous studies in dynamic planning and scheduling to draw conclusions on its current status, forward action and research needs in construction management.

Design/methodology/approach

The authors searched academic databases using planning and scheduling keywords without a periodic setting. This research collected secondary data from the database to draw an objective comparison of categories and conclusions about how the data relates to planning and scheduling to avoid the subjective responses from questionnaires and interviews. Then, applying inclusion and exclusion criteria, we selected one hundred and four articles. Finally, the study used a seven-step deductive content analysis to develop the categorisation matrix and sub-themes for describing the dynamic planning and scheduling categories. The authors used deductive analysis because of the secondary data and categories comparison. Using the event types represented in a quadrant mapping, authors delve into where, when, application and benefits of the classes.

Findings

The content analysis showed that all the accounts and descriptions of dynamic planning and scheduling are identifiable in an extensive research database. The content analysis reveals the need for multi-hybrid (4D BIM-Agent based-discrete event-discrete rate-system dynamics) simulation modelling and optimisation method for proffering solutions to scheduling and planning problems, its current status, tools and obstacles.

Originality/value

This research reveals the deductive content analysis talent in construction research. It also draws direction, focuses and raises a question on dynamic planning and scheduling research concerning the five-integrated model, an opportunity for their integration, models combined attributes and insight into its solution viability in construction.

Details

Smart and Sustainable Built Environment, vol. 11 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 August 2021

Mohammad Osama, Aly Sherif and Mohamed Badawy

This paper aims to enlighten the importance of the risk management process which is considered as a major procedure to effectively handle the potential inherent risks in the…

Abstract

Purpose

This paper aims to enlighten the importance of the risk management process which is considered as a major procedure to effectively handle the potential inherent risks in the construction industry. However, most traditional risk analysis techniques are based on theories that deal with each risk factor as an independent, which does not take into consideration the causal relationships between risk factors.

Design/methodology/approach

This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using Bayesian belief networks (BBN). Through a review of the literature, 27 risk factors were identified and categorized as the most common risk factors in the construction industry. A structured questionnaire was performed to estimate the probability and severity of these risks. Through site visits and interviews with experts in the construction field, 200 valid questionnaires were collected. A risk analysis model was developed using BBNs, then the applicability of this model was verified using a case study in Egypt.

Findings

However, the outcome showed that critical risks that manipulate administrative construction projects in Egypt were corruption and bribery, contractor financial difficulties, force majeure, damage to the structure and defective material installation.

Practical implications

The proposed study presents the possibilities available to the project parties to obtain a better forecast of the project objectives, including the project duration, total project cost and the target quality by examining the causal relationships between project risks and project objectives.

Originality/value

This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using BBNs.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 October 2019

Majid Parchami Jalal and Shahab Shoar

This paper aims to model different causal relations among factors interacting with labour productivity in order to recognize the most important factors influencing and influenced…

Abstract

Purpose

This paper aims to model different causal relations among factors interacting with labour productivity in order to recognize the most important factors influencing and influenced by it.

Design/methodology/approach

Top 60 factors affecting labour productivity were determined and grouped into 5 major groups by reviewing previous research and interviewing relevant experts. The interactions of factors were modelled using system dynamics (SD) approach. The resulting causal loop diagrams obtained from SD were then applied for identifying the most crucial factors influencing and influenced by labour productivity through the decision-making trial and evaluation laboratory (DEMATEL) method. The impact of factors on each other was finally determined based on the opinions of 63 experts selected from the Iranian construction industry.

Findings

The results indicated that factors such as fatigue, lack of labour motivation and lack of skill are the most influencing, and factors such as schedule delay and inflation in the cost of execution are the most influenced by labour productivity. In the end, a set of recommendations to improve construction labour productivity was also presented.

Originality/value

The main contribution of the study is proposing a novel method which is capable of providing insights into how causes and effects of construction labour productivity are interrelated. Furthermore, the proposed method makes this study distinct from previous research in the light of prioritizing factors and offering recommendations according to the interrelationships among factors.

Article
Publication date: 1 August 2018

Abid Hasan, Bassam Baroudi, Abbas Elmualim and Raufdeen Rameezdeen

A significant amount of work has been performed in the area of identification of factors affecting construction productivity. Previous studies have tried to determine the most…

7886

Abstract

Purpose

A significant amount of work has been performed in the area of identification of factors affecting construction productivity. Previous studies have tried to determine the most important factors affecting construction productivity in different countries for a long time. As a result of continuous effort in this direction, researchers have identified a wide range of factors. While the subject area has matured, no general agreement could be made on the factors affecting construction productivity. To fill this gap, the purpose of this paper is to undertake a comprehensive systematic review of mainstream studies on factors affecting construction productivity published in the last 30 years (1986–2016).

Design/methodology/approach

A total of 46 articles from different sources such as journals, conference proceedings, dissertation and PhD theses were identified and thoroughly reviewed.

Findings

Gaps in research and practices are discussed and directions for future research have been proposed. The literature review indicates that despite noticeable differences in the socio-economic conditions across both developed countries and developing countries, an overall reasonable consensus exists on few significant factors impeding productivity. These are, namely, non-availability of materials, inadequate supervision, skill shortage, lack of proper tools and equipment and incomplete drawing and specifications. Nevertheless, implications of technology, site amenities, process studies, project culture, and impacts of physiological and psychological factors were not adequately covered in existing literature. The study also found that traditional construction projects have remained the main focus of these studies while green construction projects have been generally overlooked.

Research limitations/implications

The review does not include studies that report productivity at the organisational or industry level as well as total factor productivity. The scope of the review is limited to work on identification of factors affecting productivity at the activity level in construction projects.

Practical implications

The outcomes of this study would help researchers and practitioners by providing the findings of previous studies in a concise manner. It is also expected that presenting a deeper and wider perspective of the research work performed until now will direct a more focussed approach on productivity improvement efforts in the construction industry.

Originality/value

This review paper undertakes a comprehensive systematic review of studies on identification of factors affecting construction productivity published during the last three decades.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 7
Type: Research Article
ISSN: 0969-9988