Search results

1 – 10 of over 1000
Article
Publication date: 8 March 2021

Michael C.P. Sing, Ivan W.H. Fung, David John Edwards and Henry Liu

This paper develops a platform that can be used to determine how to effectively and efficiently deal with a large number of temporary facilities under a constrained site…

Abstract

Purpose

This paper develops a platform that can be used to determine how to effectively and efficiently deal with a large number of temporary facilities under a constrained site condition(s). The ultimate goal is to reduce the material handling costs between transformation phases of construction works occurring during the project's development period.

Design/methodology/approach

Empirical and deductive research is first adopted to mathematical model dynamic site layout planning using the branch and bond algorithm (B&B). Second, a real-life construction project is examined to illustrate how dynamic site layout planning (using the aforementioned B&B algorithm and a computer software program called LINGO) can reduce the material handling costs. The application of the proposed methodology is then showcased against a case study that utilizes a comparative analysis between the “dynamic” and “statistic” site planning approaches.

Findings

By dividing the construction period into different phases, the developed model is shown to be capable of optimizing the material handling costs between the phases of transformation during construction works. Optimal costs are also considered using the site boundary and unit cost for moving construction materials between two facilities. The comparative analysis results illustrate that the B&B algorithm reduces material handling costs by 33%.

Practical implications

The proposed model offers an effective planning algorithm for the site layout and location of temporary facilities. More specifically, it can make a substantial improvement in reducing the travel time and material handling cost between the temporary facilities in the construction sites.

Originality/value

The primary knowledge contribution of this study to the site layout is successfully deal with the unequal area problem of temporary site facilities and incorporates the concept of dynamics site planning into the algorithm.

Details

International Journal of Building Pathology and Adaptation, vol. 40 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Content available
Article
Publication date: 20 July 2021

Ming Fung Francis Siu, Michael C.P. Sing and Jayantha Wadu

311

Abstract

Details

Built Environment Project and Asset Management, vol. 11 no. 3
Type: Research Article
ISSN: 2044-124X

Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 September 2022

Michael C.P. Sing, Sophie, Y.Y. Luk, Ken H.C. Chan, Henry J. Liu and Richard Humphrey

In Hong Kong, over 20,000 private residential buildings will be 50 plus years old by 2039. However, building maintenance has not been owners’ popular interest because of the high…

Abstract

Purpose

In Hong Kong, over 20,000 private residential buildings will be 50 plus years old by 2039. However, building maintenance has not been owners’ popular interest because of the high cost as well as the complexities in justifying whether the quantities and prices of the maintenance works are reasonable. This paper therefore aims to validate the practicality of adopting Scan-to-BIM: Terrestrial Laser Scan (TLS) and Building Information Modelling (BIM) to perform quantity take-offs (QTO) for estimating building maintenance costs.

Design/methodology/approach

A 64-year-old tenement building was selected to conduct a case study. In this instance, the building had undergone a Scan-to-BIM survey approach to generate QTO for the bills of quantities for external painting works. The Scan-to-BIM approach includes site visit, positioning of scanning equipment, assignment of circular scan routes, point cloud registration and identification of residual error. After that, time, cost and quality data were logged into contrast with QTO on as-built plans for external wall plastering works.

Findings

The “time”, “cost” and “quality” of the Scan-to BIM practice were then examined and compared with the prevailing practices of manual measurements on as-built drawings. As noted from the results, the initial cost of Scan-to BIM is high, owing to the cost of equipment, software and capable available operators. However, the authors identified that the time and cost can be significantly minimised by developing and implementing efficient practices such as preparing a detailed scan plan, equipping modeller with quantity surveying knowledge, using automated object recognition and 5D BIM software packages such as Vico Office and CostX.

Practical implications

The upshot is that Scan-to-BIM could be one of the measures to advance the clarity in the QTO and estimated price of the maintenance projects.

Originality/value

The practicability of Scan-to-BIM has received limited attention on existing building maintenance project. The Scan-to-BIM approach was examined using a case building of a 64-year-old tenement building. The approach demonstrated in this research study is promised to advance the clarity in the QTO and estimated price of maintenance project.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 25 August 2021

Michael C.P. Sing, David J. Edwards, Arthur W.T. Leung, Henry Liu and Chris J. Roberts

The accuracy and reliability of subjectively assessing a construction project's complexity at the pre-construction stage is questionable and relies upon the project manager's…

Abstract

Purpose

The accuracy and reliability of subjectively assessing a construction project's complexity at the pre-construction stage is questionable and relies upon the project manager's tacit experiences, knowledge and background. The purpose of this paper is to develop a scientifically robust analytical approach by presenting a novel classification mechanism for defining the level of project complexity in terms of work contents (WCs), scope, building structures (BSs) and site conditions.

Design/methodology/approach

Empiricism is adopted to deductively analyze variables obtained from secondary data within extant literature and primary project data to develop project type classifications. Specifically, and from an operational perspective, a two-stage “waterfall process” was adopted. In stage one, the research identified 56 variables affecting project complexity from literature and utilized a structured questionnaire survey of 100 project managers to measure the relevance of these. A total of 27 variables were revealed to be significant and exploratory factor analysis (EFA) is adopted to cluster these variables into six-factor thematic groups. In stage two, data from 62 real-life projects (including the layout and structural plans) were utilized for computing the factor score using the six-factor groups. Finally, hierarchical cluster analysis (HCA) is adopted to classify the projects into collected distinctive groups and each of a similar nature and characteristics.

Findings

The developed theoretical framework (that includes a novel complex index) provides a robust “blueprint platform” for main contractors to compile their project complexity database. The research outputs enable project managers to generate a more accurate picture of complexity at the pre-construction stage.

Originality/value

While numerous research articles have provided a comprehensive framework to define project complexity, scant empirical works have assessed it at the pre-construction stage or utilized real-life project samples to classify it. This research addresses this knowledge gap within the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 June 2021

Michael C.P. Sing, Venus W.C. Chan, Joseph H.K. Lai and Jane Matthews

Sustainable retrofitting of aged buildings plays a significant role in reducing energy demands and greenhouse gas emissions. This study aims to assess the performance and…

Abstract

Purpose

Sustainable retrofitting of aged buildings plays a significant role in reducing energy demands and greenhouse gas emissions. This study aims to assess the performance and effectiveness of energy retrofit measures (ERMs) for an archetype of aged multi-storey residential buildings.

Design/methodology/approach

The methodology consists of three parts, namely, a desktop study including the selection of a case-study building and identification of ERM options for the building; development of a computer model to simulate the building’s energy use in the baseline scenario and different scenarios of ERMs; and evaluation of the ERMs based on energy-saving rate.

Findings

Among the 13 ERMs tested, lighting-related ERMs were found to be optimal measures while window fin is the least suitable option in terms of energy saving. Based on the research findings, a two-level retrofitting framework was developed for aged multi-storey buildings.

Research limitations/implications

Future studies may take a similar approach of this study to develop retrofitting frameworks for other types of buildings, and further research paper can be extended to study retrofitting for buildings in a district or a region.

Practical implications

The findings of this study can serve as a reference for building owners to select effective ERMs for aged multi-storey buildings, which invariably exist in developed cities.

Originality/value

This study presents a pioneering work where an energy model and a building archetype were used to analyze the energy savings of a variety of ERMs that are applicable to aged multi-storey buildings.

Article
Publication date: 28 February 2019

David Edwards, Erika A. Parn, Michael C.P. Sing and Wellington Didibhuku Thwala

Tracked hydraulic excavators are versatile and ubiquitous items of off-highway plant and machinery that are utilised throughout the construction industry. Each year, a significant…

Abstract

Purpose

Tracked hydraulic excavators are versatile and ubiquitous items of off-highway plant and machinery that are utilised throughout the construction industry. Each year, a significant number of excavators overturn whilst conducting a lifting operation, causing damage to property, personnel injury or even fatality. The reasons for the overturn are myriad, including: operational or environmental conditions; machine operator acts or omissions; and/or inadequate site supervision. Furthermore, the safe working load (SWL) figure obtained from manufacturer guidance and utilised in lift plans is based upon undertaking a static load only. The purpose of this paper is to determine whether the SWL is still safe to be used in a lift plan when slewing a freely suspended (dynamic) load, and, if not, whether this may be a further contributory factor to overturn incidents.

Design/methodology/approach

Previous research has developed a number of machine stability test regimes but these were largely subjective, impractical to replicate and failed to accurately measure the “dynamic” horizontal centrifugal force resulting from slewing the load. This research contributes towards resolving the stability problem by critically evaluating existing governing standards and legislation, investigating case studies of excavator overturn and simulating the dynamic effects of an excavator when slewing a freely suspended load at high rotations per minute (rpm). To achieve this, both the static load and horizontal centrifugal force from slewing this load were calculated for six randomly selected cases of an excavator, with different arm geometry configurations.

Findings

The results from the six cases are presented and a worked example of one is detailed to demonstrate how the results were derived. The findings reveal that the SWL quoted on an excavator’s lift rating chart considerably underestimates the extra forces experienced by the machine when an additional dynamic load is added to the static load whilst lifting and slewing a freely suspended load.

Originality/value

This work presents the first attempt to accurately model excavator stability by taking consideration of the dynamic forces caused by slewing a freely suspended load and will lead to changes in the way that industry develops and manages lift plans. Future research proposes to vary the weight of load, arm geometry and rpm to predict machine stability characteristics under various operational conditions, and exploit these modelling data to populate pre-programmed sensor-based technology to monitor stability in real time and automatically restrict lift mode operations.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 May 2020

Jin Wu, Henry J. Liu, Michael C.P. Sing, Richard Humphrey and Jianfeng Zhao

This paper investigates the policy changes made towards infrastructure public–private partnerships (PPPs). The purpose of this study is to empirically identify the policy risks…

Abstract

Purpose

This paper investigates the policy changes made towards infrastructure public–private partnerships (PPPs). The purpose of this study is to empirically identify the policy risks associated with the development of PPPs and to assess their impacts on the projects.

Design/methodology/approach

A case study of the policy changes that have been implemented for PPPs in China over the past seven years has been undertaken and is presented in this study. The causal loop diagrams are applied to assess and illustrate the potential impacts of the risks as a result of such changes on PPPs.

Findings

A sequence of the policy risks, which relate to PPP risk allocation, contract management and implementation, payment and abatement mechanisms and financing, has been identified. It is also found that the identified risks will generate significant but negative impacts on PPPs, leading to an ineffective project delivery, low revenue, poor service quality and even contract breach.

Practical implications

This research provides the private-sector entities that will embark on PPPs with an insight into managing and controlling policy risks over the project's lifecycle.

Originality/value

PPPs have been critical for infrastructure development worldwide. Nevertheless, they have been a controversy, as many of them were subjected to poor outputs. Consequently, a variety of political mechanisms has been implemented to enhance the governance for PPPs. Policy can bring not only benefits but also risks and, however, policy risks of PPPs with a particular assessment for their potential impacts have received limited attention. Therefore, the study presented in this paper will contribute to the identification and assessment of policy risks within the context of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 January 2017

Isaac Heard, Peter E.D. Love, Michael C.P. Sing and Veronica Goerke

Research examining the role of construction and involvement of resource organisations with indigenous reconciliation has been very limited in Australia. This paper aims to examine…

6360

Abstract

Purpose

Research examining the role of construction and involvement of resource organisations with indigenous reconciliation has been very limited in Australia. This paper aims to examine how a sample of organisations from Western Australia (WA) are engaging with indigenous reconciliation.

Design/methodology/approach

A questionnaire survey juxtaposed with in-depth interviews are used to explore how construction and resource companies (mining and energy) operating in WA have been planning to build better relationships with the indigenous community as part of their corporate social responsibility (CSR) programme.

Findings

The majority of construction and resource companies sampled embraced reconciliation as part of a contractual and legal requirement rather than part of their CSR. It was acknowledged that to effectively address the issues associated with reconciliation and indigenous engagement, there is a requirement for flexibility and adaption of existing protocols and processes to better suit the cultural differences that arise with interactions between indigenous and non-indigenous peoples.

Research limitations/implications

The questionnaire survey was cross-sectional, and a limited number of in-depth interviews were undertaken. Respondents’ opinions were sought about their organisations’ reconciliation action plans, which have only been recently embraced by firms, and thus, views that were solicited should not be treated as being definitive.

Originality/value

Research examining the role of construction and involvement of resource organisations with indigenous reconciliation in the construction and resource sector has been limited. The findings of this study can provide a platform for examining and comparing how construction and resource organisations in different countries are embracing the process of reconciliation with their indigenous peoples.

Details

Construction Innovation, vol. 17 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Abstract

Details

The Handbook of Road Safety Measures
Type: Book
ISBN: 978-1-84855-250-0

1 – 10 of over 1000