Search results

1 – 10 of 16
Article
Publication date: 30 March 2022

Igor Martek, M. Reza Hosseini, Serdar Durdyev, Mehrdad Arashpour and David J. Edwards

Universities have recognized their rich endowments in research, academic skills and facilities, as uniquely suited to finding “green” solutions. Moreover, the campus setting…

390

Abstract

Purpose

Universities have recognized their rich endowments in research, academic skills and facilities, as uniquely suited to finding “green” solutions. Moreover, the campus setting itself presents as a microcosm of greater society through which to investigate and test innovations. Thus, the “living lab” was born, a means of coupling sufficient resources and active stakeholders in the pursuit of practical, sustainable solutions. Much of the work to date, however, remains piecemeal, small-scale and disparate. This study aims to propose that the work of such labs must ultimately be directed, coordinated and integrated under a “university sustainability office,” if they are to be ultimately effective.

Design/methodology/approach

The research approach is twofold. In the first instance, a literature review charting the history and progress of living labs is reported, with emphasis of the university context. Second, a case study appraisal of Deakin University’s initiatives in adopting and promoting sustainability through the living lab framework is undertaken.

Findings

A main finding of this paper is that current efforts remain piecemeal and peripheral. If the apparent ambiguity regarding commitment is to be overcome, Deakin University should adopt measures as adopted by peer leaders in the field. Specifically, the setting up of a centralizing sustainability function bestowed with the capacity to coordinate university-wide living lab efforts, and at such a scale that substantial benefits transferable to greater society is generated.

Originality/value

This paper stands out among previous studies in the field through facilitating a transition to living lab for other universities, where findings facilitate that progress and consider how the lessons learnt might inform the further evolution of university living lab initiatives.

Details

International Journal of Sustainability in Higher Education, vol. 23 no. 6
Type: Research Article
ISSN: 1467-6370

Keywords

Article
Publication date: 30 April 2021

Ying Zhao, Wei Chen, Mehrdad Arashpour, Zhuzhang Yang, Chengxin Shao and Chao Li

Prefabricated construction is often hindered by scheduling delays. This paper aims to propose a schedule delay prediction model system, which can provide the key information for…

Abstract

Purpose

Prefabricated construction is often hindered by scheduling delays. This paper aims to propose a schedule delay prediction model system, which can provide the key information for controlling the delay effects of risk-related factors on scheduling in prefabricated construction.

Design/methodology/approach

This paper combines SD (System Dynamics) and BP (Back Propagation) neural network to predict risk related delays. The SD-based prediction model focuses on dynamically presenting the interrelated impacts of risk events and activities along with workflow. While BP neural network model is proposed to evaluate the delay effect for a single risk event disrupting a single job, which is the necessary input parameter of SD-based model.

Findings

The established model system is validated through a structural test, an extreme condition test, a sensitivity test, and an error test, and shows an excellent performance on aspect of reliability and accuracy. Furthermore, 5 scenarios of case application during 3 different projects located in separate cities prove the prediction model system can be applied in a wide range.

Originality/value

This paper contributes to academic research on combination of SD and BP neural network at the operational level prediction, and a practical prediction tool supporting managers to take decision-making in a timely manner against delays.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 February 2024

Laura Gutierrez-Bucheli, Jian Tsen Goh, Ali Rashidi, Duncan Maxwell, Ross Digby, Yihai Fang, Henry Pook and Mehrdad Arashpour

In the realm of construction education, the investigation of immersive learning and extended reality (XR) technologies has experienced a surge in recent times. Nevertheless, there…

Abstract

Purpose

In the realm of construction education, the investigation of immersive learning and extended reality (XR) technologies has experienced a surge in recent times. Nevertheless, there remains a notable lack of comprehension surrounding the most efficient ways to integrate these technologies into tailored teaching approaches for vocational construction training. This research study aims to pinpoint the key factors that construction vocational education and training (VET) providers must consider when introducing XR technologies into their training schemes.

Design/methodology/approach

This study conducted an in-depth literature review to develop an initial framework to summarise training, technology and institutional factors influencing the educational-technology integration of XR technologies in VET. In addition, this study utilised a Delphi technique, including semi-structured group discussions and two rounds of online follow-up questionnaires, to capture VET experts’ judgements on the importance of decision-making criteria.

Findings

This study has identified the critical factors to be considered in the VET sector when adopting XR technologies. Findings revealed institutional factors were the most important criteria for participants, followed by training and technology factors.

Research limitations/implications

The current decision-making process focuses on selecting XR technologies rather than evaluating their performance after implementation. Therefore, more research is needed to monitor the implementation of this technology in curricula from a senior management perspective. This will help to understand the cost and value factors related to the value proposition of XR technologies in courses.

Practical implications

To ensure the success and long-term viability of the technology-curriculum interface, it is important to consider factors such as the availability of technical and educational support, data security and cost-effectiveness. It is also crucial to focus on ease of use and content development that emphasises instruction to create engaging content for learners.

Originality/value

The potential impact of this study is underpinned by two facts: (1) it constitutes the first effort made in the field to comprehensively elicit VET expert judgements in relation to XR technologies, and (2) it offers decision-making criteria that are at play in seeking to take advantage of high-cost technologies that are rapidly evolving. While there is no simple checklist for XR implementation, this study takes a step further to identify significant factors influencing XR integration in vocational construction training.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 July 2018

Rebecca Jing Yang, Sajani Jayasuriya, Chathuri Gunarathna, Mehrdad Arashpour, Xiaolong Xue and Guomin Zhang

The complicated nature of megaprojects requires appropriate analysis of multiple stakeholders to achieve project objectives and to accommodate stakeholder interests. During the…

2807

Abstract

Purpose

The complicated nature of megaprojects requires appropriate analysis of multiple stakeholders to achieve project objectives and to accommodate stakeholder interests. During the last two decades, many stakeholder theories and empirical studies have sprouted. Although previous studies have contributed to the development of stakeholder theory, it seems that these theoretical advances have not been fully adopted and acknowledged in practices, especially in megaprojects. The purpose of this paper is to explore the evolution of stakeholder analysis and engagement practices adopted in the Australian megaprojects over the last two decades.

Design/methodology/approach

Four mega construction projects are described and analysed in this study. Secondary data were first assembled in order to get general knowledge of each case. Interviews were conducted with the project directors. Project documents were collected from the project teams and reviewed. Wherever the project information was unclear, e-mails were sent to the directors and the team members to confirm the details.

Findings

Project teams have started to apply snowball rolling and stakeholder attribute assessment methods to analyse stakeholders. However, there is still a way to adopt the “network” analysis perspective because the project teams are reluctant to use complicated tools which need specialists’ assistance. The stakeholder engagement practices have evolved to an extent where the project teams monitor the dynamics of stakeholders’ requirements. Projects teams have identified the importance of continuity to manage stakeholders in these massive projects. However, a structured method selection mechanism for stakeholder engagement has not been developed.

Originality/value

This study will help academics to understand the adoption progress and status of stakeholder management methods.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 January 2022

Ali Mohammad Mirzaee, M. Reza Hosseini, Igor Martek, Payam Rahnamayiezekavat and Mehrdad Arashpour

Legal remedies are incorporated into international construction joint ventures (ICJVs) to mitigate contractual breaches. The effectiveness of remedies is predicated on two…

Abstract

Purpose

Legal remedies are incorporated into international construction joint ventures (ICJVs) to mitigate contractual breaches. The effectiveness of remedies is predicated on two conditions; the comprehensiveness of the contract and its enforceability within the jurisdiction of interpretation. Relational-related weaknesses contribute to contracting parties placing a premium on the contract's capacity for mediating the relationship. However, contracts are not always enforceable. This study aims to examine means by which joint venture relational governance can be maintained under conditions of minimal legal recourse.

Design/methodology/approach

A relational contracting (RC) theory was used as the theoretical underpinning of the paper. Data were collected and analyzed following a multiple-case study approach from case projects in which ICJVs' was used.

Findings

The findings reveal (1) 17 relational and contractual governance problems; the main six being contractual flexibility, contractual joint venture system, contract reviewing, project conflict, national culture and leader–follower transgressions; (2) relational and contractual governance problems are managed differently, depending on financing sources and partners' national culture; and (3) that a developed RC-based framework comprising four stages is able to facilitate relational and contractual governance in ICJVs.

Originality/value

This study is novel in providing a guided approach to developing non-legal remedies for the mitigation of contractual breaches in ICJVs, grounded in theory and contextualized for the construction sector.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 June 2024

Ahmed Farouk Kineber, Nehal Elshaboury, Sherif Mostafa, Ahmed Abdiaziz Alasow and Mehrdad Arashpour

The engineering courses offered in Somali universities attract many students, ranging between 300 and 500 every semester, making the management and delivery of the course…

Abstract

Purpose

The engineering courses offered in Somali universities attract many students, ranging between 300 and 500 every semester, making the management and delivery of the course challenging. The increasing popularity of massive open online courses (MOOCs) has led to rapid growth in enrollment, posing difficulties in effectively managing and delivering content to large volumes of learners. To this end, this study aimed to explore the influence of MOOC implementation factors on learners’ continuance intention and satisfaction to provide insights that can enhance the learning experience and ensure long-term engagement.

Design/methodology/approach

The study utilized a survey approach based on an extensive literature review to collect data on the challenges faced by Somali universities in managing and delivering engineering courses. The survey included a series of questions, and 148 responses were collected from students enrolled in different programs. The collected data were analyzed using partial least squares-structural equation modeling and deep neural network approaches.

Findings

The result demonstrated that MOOC implementation factors, including course design quality, instructor reputation, self-paced flexibility, information relevance, platform usability and student support services, significantly affect students’ continuance intention and satisfaction. Therefore, the study recommends universities should enhance MOOC implementation factors to improve the quality of teaching and increase students’ continuance intention to study in a MOOC environment.

Originality/value

The study provides empirical evidence on how MOOC implementation factors affect the level of satisfaction and continuance intention of engineering students. It suggests that the findings could be useful for university management and lecturers to increase teaching and learning quality in the course and develop new strategies and approaches that suit modern-day learners. The study also aims to enhance the efficiency and effectiveness of class delivery and improve student engagement in the learning process.

Details

International Journal of Educational Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0951-354X

Keywords

Article
Publication date: 9 May 2024

Saeed Reza Mohandes, Atul Kumar Singh, Abdulwahed Fazeli, Saeed Banihashemi, Mehrdad Arashpour, Clara Cheung, Obuks Ejohwomu and Tarek Zayed

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is…

Abstract

Purpose

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is still constrained. This study seeks to identify and examine the digital twin’s implementation barriers in construction building projects to augment operational performance and sustainability.

Design/methodology/approach

An iterative two-stage approach was adopted to explore the phenomena under investigation. General DT Implementation Barriers were first identified from extant literature and subsequently explored using primary questionnaire survey data from Hong Kong building industry professionals.

Findings

Survey results illustrated that Lack of methodologies and tools, Difficulty in ensuring a high level of performance in real-time communication, Impossibility of directly measuring all data relevant to the DT, need to share the DT among multiple application systems involving multiple stakeholders and Uncertainties in the quality and reliability of data are the main barriers for adopting digital twins' technology. Moreover, Ginni’s mean difference measure of dispersion showed that the stationary digital twin’s barriers adoption is needed to share the DT among multiple application systems involving multiple stakeholders.

Practical implications

The study’s findings offer valuable guidance to the construction industry. They help stakeholders adopt digital twins' technology, which, in turn, improves cost efficiency and sustainability. This adoption reduces project expenses and enhances environmental responsibility, providing companies a competitive edge in the industry.

Originality/value

This research rigorously explores barriers to Digital Twin (DT) implementation in the Hong Kong construction industry, employing a systematic approach that includes a comprehensive literature review, Ranking Analysis (RII) and Ginni’s coefficient of mean difference (GM). With a tailored focus on Hong Kong, the study aims to identify, analyze and provide novel insights into DT implementation challenges. Emphasizing practical relevance, the research bridges the gap between academic understanding and real-world application, offering actionable solutions for industry professionals, policymakers and researchers. This multifaceted contribution enhances the feasibility and success of DT implementation in construction projects within the Architecture, Engineering and Construction (AEC) sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 June 2023

Argaw Gurmu, M. Reza Hosseini, Mehrdad Arashpour and Wellia Lioeng

Building defects are becoming recurrent phenomena in most high-rise buildings. However, little research exists on the analysis of defects in high-rise buildings based on data from…

Abstract

Purpose

Building defects are becoming recurrent phenomena in most high-rise buildings. However, little research exists on the analysis of defects in high-rise buildings based on data from real-life projects. This study aims to develop dashboards and models for revealing the most common locations of defects, understanding associations among defects and predicting the rectification periods.

Design/methodology/approach

In total, 15,484 defect reports comprising qualitative and quantitative data were obtained from a company that provides consulting services for the construction industry in Victoria, Australia. Data mining methods were applied using a wide range of Python libraries including NumPy, Pandas, Natural Language Toolkit, SpaCy and Regular Expression, alongside association rule mining (ARM) and simulations.

Findings

Findings reveal that defects in multi-storey buildings often occur on lower levels, rather than on higher levels. Joinery defects were found to be the most recurrent problem on ground floors. The ARM outcomes show that the occurrence of one type of defect can be taken as an indication for the existence of other types of defects. For instance, in laundry, the chance of occurrence of plumbing and joinery defects, where paint defects are observed, is 88%. The stochastic model built for door defects showed that there is a 60% chance that defects on doors can be rectified within 60 days.

Originality/value

The dashboards provide original insight and novel ideas regarding the frequency of defects in various positions in multi-storey buildings. The stochastic models can provide a reliable point of reference for property managers, occupants and sub-contractors for taking measures to avoid reoccurring defects; so too, findings provide estimations of possible rectification periods for various types of defects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 22 July 2019

Serdar Durdyev, M. Reza Hosseini, Igor Martek, Syuhaida Ismail and Mehrdad Arashpour

The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia.

1133

Abstract

Purpose

The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia.

Design/methodology/approach

Barriers recording highest citation amongst researchers worldwide were collated in the form of a conceptual model. This model was validated via a partial least squares structural equation modelling technique.

Findings

Findings advance the body of knowledge on IPD by providing original insights into the nature of key barriers, quantifying the relative importance of each barrier.

Research limitations/implications

Despite the above-mentioned contributions, and before drawing any conclusion, it is prudent to acknowledge limitations, particularly the chosen research approach in focusing on the Malaysian context. Therefore, caution must be exercised in direct application of findings to other contexts; research findings should be seen through the lens of moderatum generalisations (see Payne and Williams, 2005).

Practical implications

Apart from contributions to the body of knowledge, for the world of practice, conditions impacting a transition to IPD are discussed, with a recommendation for change management through a tested mechanism like the European Corporate Sustainability Framework.

Originality/value

Being the first empirical study undertaken to quantify the relationship among the identified barriers and IPD, the present study contributes to the field by addressing the gap in IPD research in Malaysia, as an exemplar of a developing country; it creates knowledge to inform further improvements in project performance through facilitating IPD use. The study also offers insight to construction stakeholders in other developing countries for tackling issues that hinder the adoption of an IPD approach, and it also points to major barriers such that resources for tackling barriers may be allocated properly.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 16