Article
Publication date: 10 August 2023

K.I.L. Abhayantha, B.A.K.S. Perera, H.A.H.P. Perera and Roshani S. Palliyaguru

Environmental risks (ERs) are critical to any highway construction project (HCP). One of the main contracting parties responsible for ERs is the contractor. Hence, it has been…

Abstract

Purpose

Environmental risks (ERs) are critical to any highway construction project (HCP). One of the main contracting parties responsible for ERs is the contractor. Hence, it has been crucial to look into ways to control ERs in HCPs from the contractor’s perspective. This study aims to investigate how ERs can be managed in HCP in Sri Lanka.

Design/methodology/approach

A quantitative research approach with three rounds of Delphi was used. Statistical techniques were used to analyse and validate the ERs, the parties to whom the risks were to be allocated, and risk management measures identified from the empirical data collection.

Findings

The study reveals the 11 most significant ERs for HCP. Further, the most significant ERs in HCP were mainly found to be the responsibility of contractors in Sri Lanka. Twenty-four most appropriate risk response measures were determined; 13 were found to be common measures that could be used to manage two or more risks, while the remaining 11 were unique to specific risks.

Originality/value

Overall, this research determines the most significant ERs in HCP, the best risk allocation among the parties and appropriate risk-handling strategies and measures for each significant ERs. Additionally, the study addresses the demand for ERs management in HCP.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 April 2024

Deraniyagalage Chanaka Karunarathna, H.A.H.P. Perera, B.A.K.S. Perera and P.A.P.V.D.S. Disaratna

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with…

19

Abstract

Purpose

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.

Design/methodology/approach

The study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.

Findings

The findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.

Originality/value

This study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords