Article
Publication date: 22 January 2024

Yanhui Du, Jingfeng Yuan, ShouQing Wang, Yan Liu and Ningshuang Zeng

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation…

149

Abstract

Purpose

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation department, which negatively impacts the information quality, leading to information asymmetry and undermining the overall effectiveness of supervision. This study aims to explore how to use blockchain to anchor the information used for supervision in PPP projects to the original information, to strengthen the oversight.

Design/methodology/approach

This paper adopts the principles of design science research (DSR) to design a conceptual framework that systematically organizes information along the information dissemination chain, ensuring the reliable anchoring of original information. Two-stage interviews involving experts from academia and industry are conducted, serving as formative and summative evaluations to guide the design.

Findings

The framework establishes a weak-centralized information organizing mode, including the design of governance community and on-chain and off-chain governance mechanisms. Feedback from experts is collected via interviews and the designed framework is thought to improve information used for supervision. Constructive suggestions are also collected and analyzed for further development.

Originality/value

This paper provides a novel example exploring the inspirations blockchain can bring to project governance, like exercising caution regarding the disorderly expansion of public sector authority in addressing information disadvantages and how to leverage blockchain to achieve this. Technical details conveyed by the framework deepen understanding of how blockchain benefits and the challenges faced in successful implementation for practitioners and policymakers. The targeted evaluation serves as rigorous validation, guiding experts to provide reliable feedback and richer insights by offering them a more cognitively convenient scenario.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 September 2022

Bingsheng Liu, Juankun Li, Dan Wang, Henry Liu, Guangdong Wu and Jingfeng Yuan

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs…

Abstract

Purpose

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs. It examines the transmission pattern (i.e. the way in which network members react to each other) of the IFs network.

Design/methodology/approach

Literature review and interview were adopted to identify the IFs. Then, with the data collected from the interview in China, the social network analysis and interpretive structure model were synergised to examine the chain reaction, driving and dependent powers, and hierarchical structure of the identified IFs.

Findings

The results reveal that the cognition, institutional, financial and participation aspects are key barriers confronted by PPP sustainability, and the government plays a leading role in controlling factors causing sustainability-related problems in PPPs. Weak government leadership and institutional environment were identified as the most fundamental reasons triggering a chain of IFs, while project governance and management activities act as bridge nodes that play an intermediary role in the IFs network.

Research limitations/implications

This research contributes to the literature on PPP governance by (1) bridging the literature gap through the development of CGF for explaining the governance of PPP sustainability with a holistic view that considers both macro environment and operational project processes; and (2) identifying the transmission pattern of IFs network which uncovers the underlying dynamics causing the unsustainable operation of PPPs.

Practical implications

This research provides practitioners with a list of key checkpoints for preventing failure escalation, enables decision-makers to prioritise obstacle-mitigation efforts and develop a feasible process to control PPP operation, and offers management countermeasures to remove the key barriers impeding PPP sustainability.

Originality/value

This study is novel for adopting network-oriented techniques to quantify the relative importance of the IFs and examine the transmission pattern of the IFs system. Therefore, it visualises the complex underlying dynamics causing unsustainable PPP operation, identifies root and direct causes of PPP failures, and provides decision-makers with insights into sustaining PPP sustainability from a network-oriented perspective.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 April 2020

Zhao Xu, Xiang Wang, Ya Xiao and Jingfeng Yuan

There is often a lack of accurate performance evaluation in Public–Private Partnership (PPP) projects. It is a challenging issue to effectively use Building Information Modeling…

1144

Abstract

Purpose

There is often a lack of accurate performance evaluation in Public–Private Partnership (PPP) projects. It is a challenging issue to effectively use Building Information Modeling (BIM) for PPP project performance evaluation. The objective of this study is to develop a PPP project performance evaluation model based on Industry Foundation Classes (IFC) and an enhanced matter-element method to more precisely evaluate PPP project performance.

Design/methodology/approach

The performance evaluation of PPP projects in the construction and operation period was explored. The PPP project performance evaluation indicator system was first established based on a literature review and PPP project practice. Then, the evaluation indicator information was expressed through IFC mapping and extension. After that, an IFC-based PPP project performance evaluation model was developed, and a case study was provided to validate the use of the proposed performance evaluation model.

Findings

The results of the case study show that the proposed approach can accurately and efficiently evaluate PPP projects, and it could favorably contribute to performance evaluation in PPP projects.

Research limitations/implications

This study only concerns the performance evaluation of one type of PPP project. Further research is required to study different types of PPP projects; the model needs to be more efficient and intelligent.

Originality/value

The performance evaluation of PPP projects utilizing IFC extension and the enhanced matter-element method provides guidance for the government and private parties to accurately and efficiently evaluate PPP project performance.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 May 2023

Xuewei Li, Jingfeng Yuan, Xuan Liu, Guangqi Wang and Qian-Cheng Wang

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance…

Abstract

Purpose

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance objectives but also to realising value added. However, the effect of traditional contract management on realising the value creation objectives of PPP projects is limited. According to the view of multifunctional contract, joint-contract functions that integrate contract control and flexibility are likely to be effective in enhancing the value creation of PPP projects. This study aims to explore the effects of joint-contract functions on PPP project value creation and relevant influencing mechanism by investigating the mediating effect of in-role behaviour and extra-role behaviour.

Design/methodology/approach

After collecting 258 valid questionnaires from PPP professionals in China, this study used structural equation modelling to validate the hypotheses.

Findings

Contract control and flexibility can improve PPP project value creation. Specifically, contract control improves the achievement of the basic contract objectives of PPP projects, whereas contract flexibility enhances the achievement of the value-added of PPP projects. Moreover, only in-role behaviour mediates the effect of contract control on value creation. In addition, the mediating effect of extra-role behaviour on the impact of contract flexibility on value creation is stronger than that of in-role behaviour. The mediating effect of in- and extra-role behaviour is mainly reflected in the realisation of basic and value-added performance, respectively.

Research implications

The findings of this study can help realise value creation in three ways. Firstly, new perspectives for PPP project value creation should be proposed by combining the improvement of contract objectives and the realisation of the participants' implicit demands. Secondly, the effects of different contract functions on value creation should be analysed instead of a single dimension of contractual governance. Thirdly, the mediating effects of different types of cooperation behaviour that may influence the relationship between contractual governance and value creation should be evaluated.

Originality/value

This study verifies the impacts of different contract functions on PPP project value creation. In addition, cooperative behaviour is embedded as a mediating variable, and the mediated transmission path from contract function to cooperative behaviour and further to PPP project value creation is systematically analysed.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 February 2020

Jingfeng Yuan, Xuewei Li, Yongjian Ke, Wei Xu, Zhao Xu and M. Skibnewski

Effective performance management (PM) in public–private partnership (PPP) projects is critical to realizing value for money (VFM). This study aims to provide an in-depth…

1042

Abstract

Purpose

Effective performance management (PM) in public–private partnership (PPP) projects is critical to realizing value for money (VFM). This study aims to provide an in-depth understanding of problems existing in PPP PM and possible avenues for improvement, presenting an experimental system to verify that building information modeling (BIM) and other information communication technologies can improve PPP PM.

Design/methodology/approach

The mixed research method adopted in this study combined empirical research with experimental research. Semistructured interviews were used to ascertain the current situation of PPP PM with the help of Nvivo software. A BIM-based performance management system (BPMS), which combines BIM with Web and Cloud technology, was then constructed to achieve performance monitoring, performance measurement, and performance-based payment. Finally, a case study was introduced to explain the function application of the proposed system.

Findings

The case demonstration verified is found to verify that the developed BIM-based execution framework for PPP PM can effectively guide stakeholders toward achieving mixed PM, promote effective PM, and improve work efficiency with the support of BIM and other information and communication technologies.

Originality/value

Through the development of a BPMS for PPP projects, the effectiveness and efficiency of PM are improved. Practical PM applications are also provided to different stakeholders, through which the key performance indicators and the behaviors of the government and private-sector partners can be monitored to form a more comprehensive and reasonable PM mechanism and promote the realization of VFM in PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 September 2021

Lei Zhang, Jingfeng Yuan, Yan Ning, Nini Xia and Guodong Zhang

This study employs situated learning theory to elucidate the mechanisms of interorganizational collaboration by analyzing the relationships among absorptive capacity…

Abstract

Purpose

This study employs situated learning theory to elucidate the mechanisms of interorganizational collaboration by analyzing the relationships among absorptive capacity, institutional compensation, task cognitive integration and interorganizational collaboration in BIM-enabled construction projects.

Design/methodology/approach

An online questionnaire survey was conducted with managers and professionals involved in building information modeling (BIM-) enabled construction projects, and 220 valid responses were received. Data were analyzed by means of the linear regression models and bootstrap method.

Findings

The results show that (1) absorptive capacity, institutional compensation and task cognitive integration have a positive impact on interorganizational collaboration; (2) institutional compensation partially mediates the effect of absorptive capacity on interorganizational collaboration; (3) task cognitive integration fully mediates the effect of absorptive capacity on interorganizational collaboration; (4) institutional compensation and task cognitive integration serially and fully mediate the relationship between absorptive capacity and interorganizational collaboration and (5) the serial mediating model has a greater indirect effect than the other two models considered in this study.

Originality/value

This study contributes to the body of knowledge by demonstrating the way to break through the three types of organizational boundaries (i.e. syntactic, semantic and pragmatic organizational boundaries) and provide an internal collaborative mechanism from the perspective of situated learning theory. This study presents the critical effects of absorptive capacity, institutional compensation and task cognitive integration on interorganizational collaboration, selects the enhanced mediating model for explaining the effects of absorptive capacity on interorganizational collaboration and enables managers to update the traditional collaborative model in BIM-enabled construction projects.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 October 2022

Jianbo Zhu, Qianqian Shi, Ce Zhang, Jingfeng Yuan, Qiming Li and Xiangyu Wang

Promoting low-carbon in the construction industry is important for achieving the overall low-carbon goals. Public–private partnership is very popular in public infrastructure…

Abstract

Purpose

Promoting low-carbon in the construction industry is important for achieving the overall low-carbon goals. Public–private partnership is very popular in public infrastructure projects. However, different perceptions of low-carbon and behaviors of public and private sectors can hinder the realization of low-carbon in these projects. In order to analyze the willingness of each stakeholder to cooperate towards low-carbon goals, an evolutionary game model is constructed.

Design/methodology/approach

An evolutionary game model that considers the opportunistic behavior of the participants is developed. The evolutionary stable strategies (ESSs) under different scenarios are examined, and the factors that influence the willingness to cooperate between the government and private investors are investigated.

Findings

The results illustrate that a well-designed system of profit distribution and subsidies can enhance collaboration. Excessive subsidies have negative impact on cooperation between the two sides, because these two sides can weaken income distribution and lead to the free-riding behavior of the government. Under the situation of two ESSs, there is also an optimal revenue distribution coefficient that maximizes the probability of cooperation. With the introduction of supervision and punishment mechanism, the opportunistic behavior of private investors is effectively constrained.

Originality/value

An evolutionary game model is developed to explore the cooperation between the public sector and the private sector in the field of low-carbon construction. Based on the analysis of the model, this paper summarizes the conditions and strategies that can enable the two sectors to cooperate.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 May 2022

Jianfeng Zhao, Niraj Thurairajah, David Greenwood, Henry Liu and Jingfeng Yuan

The unprecedented SARS-CoV-2 (COVID-19) pandemic has further constrained the budgets of governments worldwide for delivering their much-needed infrastructure. Consequently…

1652

Abstract

Purpose

The unprecedented SARS-CoV-2 (COVID-19) pandemic has further constrained the budgets of governments worldwide for delivering their much-needed infrastructure. Consequently, public-private partnerships (PPPs), with the private sector's investment and ingenuity, would appear to be an increasingly popular alternative. Value for money (VfM) has become the major criterion for evaluating PPPs against the traditional public sector procurement and, however, is plagued with controversy. Hence, it is important that governments compare and contrast their practice with similar and disparate bodies to engender best practice. This paper, therefore, aims to understand governments' assessment context and provide a cross-continental comparison of their VfM assessment.

Design/methodology/approach

Faced with different domestic contexts (e.g. aging infrastructure, population growth, and competing demands on finance), governments tend to place different emphases when undertaking the VfM assessment. In line with the theory of boundary spanning, a cross-continental comparison is conducted between three of the most noticeable PPP markets (i.e. the United Kingdom, Australia and China) about their VfM assessment. The institutional level is interpreted by a social, economic and political framework, and the methodological level is elucidated through a qualitative and quantitative VfM assessment.

Findings

There are individual institutional characteristics that have shaped the way each country assesses VfM. For the methodological level, we identify that: (1) these global markets use a public sector comparator as the benchmark in VfM assessment; (2) ambiguous qualitative assessment is conducted only against PPPs to strengthen their policy development; (3) Australia's priority is in service provision whereas that of the UK and China is project finance and production; and (4) all markets are seeking an amelioration of existing controversial VfM assessments so that purported VfM relates to project lifecycles. As such, an option framework is proposed to make headway towards a sensible selection of infrastructure procurement approaches in the post COVID-19 era.

Originality/value

This study addresses a current void of enhancing the decision-making process for using PPPs within today's changing environment and then opens up an avenue for future empirical research to examine the option framework and ensuing VfM decisions. Practically, it presents a holistic VfM landscape for public sector procurers that aim to engage with PPPs for their infrastructure interventions.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 July 2020

Yan-Chun Zhang, Wu-Zan Luo, Ming Shan, Dong-Wen Pan and Wen-Jie Mu

The aims of this study are to conduct a systematic review of public–private partnership (PPP) studies published from 2009 to 2019, to compare the results with Ke et al. (2009) who…

1000

Abstract

Purpose

The aims of this study are to conduct a systematic review of public–private partnership (PPP) studies published from 2009 to 2019, to compare the results with Ke et al. (2009) who reviewed the PPP literature published from 1998 to 2008, and to trace the evolution of the PPP knowledge in the past two decades. This study also presents the possible directions that the PPP research may go towards in the future, arguably.

Design/methodology/approach

This study carried out a top journal-based search to identify the quality PPP articles published from 2009 to 2019. A total of 12 top-tier construction journals were systematically searched in the database of web of science (WOS), from which 279 PPP articles were identified for review.

Findings

The number of the identified articles, the titles of the journals, institutions, the most cited papers, and prevalent research methods were analyzed and compared. The existing PPP studies in construction journals were classified into seven streams. Through analysis of the PPP research status and gaps, five future research directions were revealed.

Originality/value

This study contributes to the current body of knowledge by revealing the research trend of PPP from 2009 to 2019. It presents the change of PPP development trend in the past decade through comparison with Ke et al. (2009). It also reveals the major research streams and points out the directions that the PPP research may go towards in the future. Moreover, this study is helpful to the practice as well. It can enhance the practitioners' understanding of the PPP development in the past decade. In addition, it identified the research institutions contributing the most in the area of PPP, which may serve as valuable reference for practitioners to locate the best institutions for consultancy or collaboration.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article