Search results

1 – 4 of 4
Article
Publication date: 6 February 2024

Ayodeji Emmanuel Oke, John Aliu, Doyin Helen Agbaje, Andrew Ebekozien, Douglas Omoregie Aghimien, Feyisetan Leo-Olagbaye and Clinton Aigbavboa

The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality…

Abstract

Purpose

The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality (IEQ) principles into building designs.

Design/methodology/approach

The study used a quantitative approach by administering a well-structured questionnaire to 114 quantity surveyors. The collected data were analyzed using methods such as frequencies, percentages, mean item scores, Kruskal–Wallis test and exploratory factor analysis.

Findings

The top five ranked constraints were limited access to funding or financing options, limited availability of green materials, limited availability of insurance for sustainable buildings, limited availability of sustainable design resources and limited diversity and inclusivity within the design profession. Based on the factor analysis, the study identified six clusters of constraints: structural-related constraints, technical-related constraints, financial-related constraints, capacity-related constraints, legal-related constraints and culture-related constraints.

Practical implications

This study has several practical implications for quantity surveying firms, policymakers and industry stakeholders involved in building design and construction in Nigeria. The findings of this study can also inform future research on the integration of IEQ principles into building designs.

Originality/value

By identifying and structuring the clusters of constraints faced by quantity surveying firms in Nigeria when implementing IEQ principles, this study provides a novel approach to understanding the challenges associated with IEQ implementation in the building sector. This understanding can guide policymakers, industry stakeholders and quantity surveying firms in developing effective strategies to overcome these constraints and promote IEQ principles in building design and construction.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 22 September 2023

Ayodeji Emmanuel Oke, John Aliu, Patricia Fadamiro, Feyisetan Leo-Olagbaye, Paramjit Singh Jamir Singh and Mohamad Shaharudin Samsurijan

Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their…

Abstract

Purpose

Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their application within specific local contexts, especially in developing countries like Nigeria, is sparse. Nigeria presents a unique context marked by challenges such as skilled labor shortage, safety concerns and cost efficiency. Therefore, investigating the implementation of automation techniques in the Nigerian construction industry is crucial to address these challenges, bring transformative advancements and contribute to a more balanced global discourse on automation adoption. This study aims to fill this significant research gap.

Design/methodology/approach

A mixed research method was deployed which combined both qualitative and quantitative data collection and analysis. Two focus group discussions conducted with 23 experts from both industry and academic institutions (qualitative) yielded 17 drivers which were used to formulate a well-structured questionnaire (quantitative), which was disseminated to construction professionals. Collected data underwent analysis through various statistical techniques, including percentages, frequencies, mean item scores and exploratory factor analysis.

Findings

Principal component analysis (PCA) yielded four driver clusters namely: (1) performance-related drivers, (2) visualization and efficiency-related drivers, (3) technological and human-related drivers and (4) economic-related drivers.

Practical implications

The study provides empirical insights that can aid stakeholders, decision-makers, policymakers and the government in formulating strategies to promote automation techniques in the Nigerian construction industry and beyond.

Originality/value

This study's originality lies in its exploration of the untapped potential of automation techniques in the Nigerian construction industry, offering novel perspectives on how these technologies can address specific challenges such as skilled labor shortage, safety concerns and cost efficiency, thereby paving the way for transformative advancements in the sector.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 11 October 2022

Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…

Abstract

Purpose

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.

Design/methodology/approach

The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.

Findings

Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.

Research limitations/implications

This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.

Practical implications

The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.

Originality/value

The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 17 August 2020

Feyisetan Leo-Olagbaye and Henry A. Odeyinka

Road projects have been characterized by risk factors impacting project objectives. Thus, this paper focused on evaluating the effect of risk on cost and time performance of some…

Abstract

Purpose

Road projects have been characterized by risk factors impacting project objectives. Thus, this paper focused on evaluating the effect of risk on cost and time performance of some selected road projects.

Design/methodology/approach

Using the theory of two-dimensional nature of risk, a questionnaire was used to collect data from 146 stakeholders involved in road projects in Osun State, Nigeria. Secondary data regarding cost and time performance of 40 selected road projects were also collected. The data collected were used to determine significant risk factors and also to develop multi-linear regression models for evaluating risk impact on cost and time performance of road projects.

Findings

Results showed that scope creep and design issues are major risk factors occurring on road projects and those political and economic factors provide higher order of impact. It further demonstrated the possibility of modelling risk impact on cost and time performance of road projects using significant risk factors.

Practical implications

The knowledge of the identified significant risk factors provides invaluable information to stakeholders regarding what risk variables to focus attention on in road construction. The developed models are also potential practical tools for decision-making.

Originality/value

The study provides a veritable tool for risk assessment that potentially helps with predicting risk impact on cost and time performance of road projects.

Details

Built Environment Project and Asset Management, vol. 10 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 4 of 4