Publication date: 22 July 2021

Farhad Sadeghineko and Bimal Kumar

Facilitating the information exchange and interoperability between stakeholders during the life-cycle of an asset can be one of the fundamental necessities for developing an…

Abstract

Purpose

Facilitating the information exchange and interoperability between stakeholders during the life-cycle of an asset can be one of the fundamental necessities for developing an enhanced information exchange framework. Such a framework can also improve the successful accomplishment of building projects. This paper aims to use Semantic Web technologies for facilitating information exchange within existing building projects.

Design/methodology/approach

In real-world building projects, the construction industry’s information supply chain may initiate from near scratch when new building projects are started resulting in diverse data structures represented in unstructured data sources, like Excel spreadsheets and documents. Large-scale data generated throughout a building's life-cycle requires exchanging and processing during an asset's Operation and Maintenance (O&M) phase. Building information modelling (BIM) processes and related technologies can address some of the challenges and limitations of information exchange and interoperability within new building projects. However, the use of BIM in existing and retrofit assets has been hampered by the challenges surrounding the limitations of existing technologies.

Findings

The aim of this paper is twofold. Firstly, it briefly outlines the framework previously developed for generating semantically enriched 3D retrofit models. Secondly, a framework is proposed focussing on facilitating the information exchange and interoperability for existing buildings. Semantic Web technologies and standards, such as Web Ontology Language and existing AEC domain ontologies are used to enhance and improve the proposed framework.

Originality/value

The proposed framework is evaluated by implementing an example application and the Resource Description Framework data produced by the previously developed framework. The proposed approach makes a valuable contribution to the asset/facilities management (AM/FM) domain. It should be of interest to various FM practices for existing assets, such as the building information/knowledge management for design, construction and O&M stages of an asset’s life-cycle.

Article
Publication date: 19 January 2024

Kenneth Lawani, Farhad Sadeghineko, Michael Tong and Mehmethan Bayraktar

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D…

93

Abstract

Purpose

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D laser scanning technologies. This case study integrated 3D laser point cloud scans with BIM to explore the effects of BIM adoption on ongoing construction project, whilst evaluating the utility of 3D laser scanning technology for producing structural 3D models by converting point cloud data (PCD) into BIM.

Design/methodology/approach

The primary data acquisition adopted the use of Trimble X7 laser scanning process, which is a set of data points in the scanned space that represent the scanned structure. The implementation of BIM with the 3D PCD to explore the precision and effectiveness of the construction processes as well as the as-built condition of a structure was precisely captured using the 3D laser scanning technology to recreate accurate and exact 3D models capable of being used to find and fix problems during construction.

Findings

The findings indicate that the integration of BIM and 3D laser scanning technology has the tendency to mitigate issues such as building rework, improved project completion times, reduced project cost, enhanced interdisciplinary communication, cooperation and collaboration amongst the project duty holders, which ultimately enhances the overall efficiency of the construction project.

Research limitations/implications

The acquisition of data using 3D laser scanner is usually conducted from the ground. Therefore, certain aspects of the building could potentially disturb data acquisition; for example, the gable and sections of eaves (fascia and soffit) could be left in a blind spot. Data acquisition using 3D laser scanner technology takes time, and the processing of the vast amount of data acquired is laborious, and if not carefully analysed, could result in errors in generated models. Furthermore, because this was an ongoing construction project, material stockpiling and planned construction works obstructed and delayed the seamless capture of scanned data points.

Originality/value

These findings highlight the significance of integrating BIM and 3D laser scanning technology in the construction process and emphasise the value of advanced data collection methods for effectively managing construction projects and streamlined workflows.