1 – 10 of 61David John Edwards, De-Graft Owusu-Manu, Bernard Baiden, Edward Badu and Peter Edward Love
In developing countries, delays in highway infrastructure projects caused by financial distress-related factors threaten the construction industry’s capacity to contribute…
Abstract
Purpose
In developing countries, delays in highway infrastructure projects caused by financial distress-related factors threaten the construction industry’s capacity to contribute optimally to economic development. Against this backdrop, this paper aims to determine factors contributing to financial distress and develops a conceptual framework to illustrate the relationship between financial distress and project delay.
Design/methodology/approach
A questionnaire survey collected data on factors that contributed to financial distress and delays in highway infrastructure delivery. In total, 78 responses were obtained, and factor analysis revealed that factors associated with payment, project financing, cash flow, economic issues, project planning and cost control influenced project delays.
Findings
The research identifies the importance of efficient public and private policies to engender financial sustainability among construction firms in developing countries.
Originality/value
This work presents the first research of its kind and strives to engender wider academic debate and renewed economic development in some of the world’s most impoverished nations.
Details
Keywords
Frederick Owusu Danso, Kofi Agyekum, Patrick Manu, Emmanuel Adinyira, Divine K. Ahadzie and Edward Badu
Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences…
Abstract
Purpose
Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences site workers' risk-taking behaviours during construction. This study aims to examine how construction site workers perceive and judge safety risks in risk-taking behaviours of site workers for intervention safety policy framework that may encourage safe work.
Design/methodology/approach
The study employed Pictorial-based Q-Methodology, which documented 63 picture scenarios of risk-taking behaviours from building sites and submitted them for validation from H&S inspectors. In total, 33 pictures emerged as having great potential to cause harm. After using these 33 pictures to elicit data from randomised site workers, the study used Frequency Tabulation, Relative Importance Index (RII) and Kruskal–Wallis Test to analyse the collected data. To fully explain the analysed data for deeper understanding, the study conducted Focus Group Discussions (FGDs) with these site workers to share the thoughts of site workers on these pictures.
Findings
Two distinctive pictures emerged from these analyses: one showing risk-taking behaviour likely to contract internal and skin disease and the other likely to fall from height. One of the implications is that construction site workers are unfamiliar with the dangerous contaminants in the materials the site workers use to work, which can potentially harm the site workers' skin and internal organs. Hence, site workers continue engaging in risk-taking behaviours. The other is that site workers are aware of and can mention catastrophic physical injuries attached to site workers' jobs. However, site workers continue engaging in risk-taking behaviours because of site workers' safety plights and rely on the favour and mercies of a supreme being as coping strategies to escape from these physical injuries.
Originality/value
This study is original in that the study uses picture scenarios of risk-taking behaviours to amass an empirical-based understanding of how site workers perceive and respond to H&S risks during construction. This piece of evidence is missing in the numerous research studies in this area. Again, the findings contribute to the state-of-the-art literature regarding risk-taking behaviours on construction sites.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and Eric Asamoah
The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private…
Abstract
Purpose
The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private partnership (PPP) projects, are more complex and essential in developing countries. Appreciating the inter relationship among these risk factors is crucial. However, there exist no studies developing quantitative models to explain how various PPP power risk factors influence each other, especially in developing countries like Ghana. This study aims to investigate and model the relationship, the probability of occurrence and severity of impact of PPP power risk factors in Ghana.
Design/methodology/approach
Data were collected through ranking type questionnaire in a two-round Delphi survey with 48 respondents using purposive and snowball sampling techniques. partial least squares structural equation modelling (PLS-SEM) was used for analysis of data.
Findings
A model was developed to investigate the influence the risk factors inherent in PPP power projects have on each other. Validity of the model was tested based on the data collected. PLS-SEM results indicated the various relationships and interdependencies the risk factors had on each other considering their probability and severity. Both significant and insignificant levels of relationships were found among the various risk factors.
Practical implications
The SEM that was developed to assess the relationships among the risk factors has great value for policy makers in the energy sector, industry practitioners, researchers and industry practitioners. Strategies can be mapped out to mitigate and effectively allocate the risks with the high interdependencies.
Originality/value
Regarding the quantitative impact of the interrelationship among risk factors in PPP power projects, the findings of this research are arguably the first to be presented for the construction sector and contribute to knowledge on PPP practice and further has implications toward achieving power sector risk mitigation.
Details
Keywords
Ernest Kissi, Theophilus Adjei-Kumi, Edward Badu and Emmanuel Bannor Boateng
Tender price remains an imperative parameter for clients in deciding whether to invest in a construction project, and it serves as a basis for tender price index (TPI…
Abstract
Purpose
Tender price remains an imperative parameter for clients in deciding whether to invest in a construction project, and it serves as a basis for tender price index (TPI) manipulations. This paper aims to examine the factors affecting tender price in the construction industry.
Design/methodology/approach
Based on the literature review, nine independent constructs and one dependent construct relating to tender pricing were identified. A structured questionnaire survey was conducted among quantity surveyors in Ghana. Partial least squares structural equation modelling (PLS-SEM) examined the influences of various constructs on tender price development (TPD) and the relationships among TPD and TPI.
Findings
Results showed that cultural attributes, client attributes, contractor attributes; contract procedures and procurement methods; consultant and design team; external factors and market conditions; project attributes; sustainable and technological attributes; and TPI have a positive influence on tender price, whereas fraudulent attributes exert a negative influence.
Practical implications
The findings offer construction professionals broader understanding of factors that affect tender pricing. The results may be used in professional decision-making in the pricing of construction projects, as they offer clearer causal relations between how each construct will influence pricing.
Originality/value
This study adds to the body of construction pricing knowledge by establishing the relationships and degree of influences of various factors on tender price. These findings provide a valuable reference for practitioners.
Details
Keywords
Joseph Asante, Ernest Kissi and Edward Badu
The needs assessment is the heart of any capacity-building strategy since it determines the design of any intervention, and also helps to prioritise the allocation of resources…
Abstract
Purpose
The needs assessment is the heart of any capacity-building strategy since it determines the design of any intervention, and also helps to prioritise the allocation of resources. Whereas there is a considerable amount of literature on the challenges faced by small- and medium-scale building contractors (SMBCs), very little is known about the needs (support) required by SMBCs. But given the critical role played by SMBCs in the construction industry demands, an understanding of how this sector can be assisted is required. The purpose of this paper is to contribute to the literature relative to capacity building of SMBCs by exploring and examining the needs with the objective to extend the understanding on how to promote and sustain SMBCs to continue their infrastructural delivery at the local and rural areas in Ghana.
Design/methodology/approach
A questionnaire with five-point Likert scale is administered to 416 respondents, including local government authorities, consultants, first-class contractors and SMBCs using simple random and purposive sampling techniques. Data generated from the survey are analysed using mean score ranking and principal component analysis, thus enabling the findings of the study to be examined under six thematic areas.
Findings
The SMCs needs identified include anti-corruption measures, job accessibility, technical and technological assistance, favourable fiscal policy, business development support and financial assistance. The findings of the study bring to the attention of policy makers the critical areas that required support by the assistance of SMBCs. In the interim, the study recommends the extension of business advisory services to the SMBCs by National Board of Small-Scale Industries, whilst in the long term, the government must create the necessary business operating environment to promote SMBCs pertaining to the industrial sector of the economy. The SMBCs must also factor the needs into their business operations that can be addressed from within.
Originality/value
The study suggests the need of SMBCs in building a robust construction industry in developing countries.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards
This paper aims to evaluate the risk factors and determines the overall risk level (ORL) of public-private-partnership (PPP) power projects in Ghana using fuzzy synthetic…
Abstract
Purpose
This paper aims to evaluate the risk factors and determines the overall risk level (ORL) of public-private-partnership (PPP) power projects in Ghana using fuzzy synthetic evaluation methodology (FSEM).
Design/methodology/approach
In this paper review of literature led to the development of a 67-factor risk list which was ranked by experts and industry practitioners through a questionnaire survey.
Findings
These factors were grouped into principal risk factors (PRFs) using component analysis and they served as the input variables for fuzzy analysis. The seven components were: Contract and Payment risks, Environmental risks, Financial and Cost risks, Legal and Guarantee risks, Operation risks, Socio-Political and Performance risks (SPR) and Tender and Negotiation risks. Study showed that the ORL of Ghanaian PPP power projects is high implying they are risky to both the public and private sectors. Fuzzy analysis also confirmed SPR as the most critical principal factor.
Originality/value
This study is significant and demonstrates that fuzzy methodology can be used as a useful risk evaluation tool and risk assessment framework for private investors, policy makers and public sector.
Details
Keywords
Lee Felix Anzagira, Daniel Duah, Edward Badu, Eric Kwame Simpeh, Samuel Amos-Abanyie and Alexander Marful
Green building (GB) is globally acclaimed as the most formidable solution to the adverse effects that buildings and construction activities have on the climate and environment…
Abstract
Purpose
Green building (GB) is globally acclaimed as the most formidable solution to the adverse effects that buildings and construction activities have on the climate and environment. Nonetheless, current evidence suggests that the adoption of GB in developing countries of Sub-Saharan Africa (SSA) is at a snail’s pace and characterized by the absence of GB codes and frameworks. This paper aims to determine the current level of adoption and implementation of GB concepts and technologies in the Ghanaian construction industry (GCI).
Design/methodology/approach
An exploratory method of investigation involving a quantitative approach was used to achieve the objectives of this study. A literature review was conducted, and a questionnaire survey was conducted among 292 stakeholders in the GCI. The survey data was analyzed using descriptive and inferential statistics as well as other quantitative analysis techniques.
Findings
The analysis revealed that the five most applied green building technologies (GBTs) are technologies for optimizing site planning, building orientation and configuration, use of natural ventilation, integrative use of natural lighting with electric lighting systems, application of energy-efficient lighting systems and use of permeable paving: low-traffic areas. Notably, the majority of the GBTs belong to the energy-efficiency technologies category.
Research limitations/implications
The findings indicate that GBTs are gaining momentum in Ghana and that there is a need for ongoing research to develop new and more environmentally friendly building technologies to aid in the preservation of our society and natural resources to achieve United Nations Sustainable Development Goals (UN SDGs) 12 and 13.
Originality/value
In effect, this study will enhance the awareness of GB development and contribute to the GB body of knowledge, particularly in the context of developing countries. It would also be useful to the GCI’s contribution to achieving the UN SDGs.
Details
Keywords
Evans Kwesi Mireku, Ernest Kissi, Edward Badu, Clinton Ohis Aigbavboa, Titus Kwofie and Kenneth Eluerkeh
The construction industry is an industry which has gained notoriety when it comes to both physical and mental health problems. Compared to other industries, the construction…
Abstract
Purpose
The construction industry is an industry which has gained notoriety when it comes to both physical and mental health problems. Compared to other industries, the construction sector has a higher prevalence of many stressors and mental health concerns. This calls for mechanisms to cope with these concerns. One coping mechanism propounded to help cope and adapt in the face of pressures and challenges is “Mental Toughness (MT)”. While mental toughness has been widely studied in various fields, there is a paucity of comprehensive research examining its significance among construction professionals. Thus, the motivation of this study is to establish the mental toughness characteristics among construction professionals in Ghana.
Design/methodology/approach
The construction industry is an industry which has gained notoriety when it comes to both physical and mental health problems. Compared to other industries, the construction sector has a higher prevalence of mental health concerns. One coping mechanism propounded to help cope and adapt in the face of pressures and challenges is “Mental Toughness (MT)”. While mental toughness has been widely studied in various fields, there is a paucity of comprehensive research examining its significance among construction professionals. Thus, the motivation of this study is to establish the mental toughness characteristics among construction professionals.
Findings
the study's findings revealed 13-factor model characteristics of mental toughness with 43 variables for mentally tough performers in the construction environment. These 13-factor models include Pressure Management (PM), Motivation (M), Emotional Intelligence (EI), Interpersonal self-belief (SB), Tough Attitude (TA), Job-related self-belief (SBB), Ethical Values (EV), Commitment (C), Focus (F), Optimism (OP), Expertise and Competence (EC), Imagery Control (IC) and Resilient (R).
Practical implications
The outcome of this study has significant practical implications for various stakeholders. For construction professionals the identified factors provide valuable insights into the psychological attributes and behaviours that contribute to mental toughness among construction professionals. Understanding these characteristics can empower professionals to develop strategies for coping with stress, maintaining focus, and fostering resilience in challenging construction environments to achieve optimum performance levels consistently.
Originality/value
The originality of this study's findings stems from the fact that it is among the first to provide greater insight into mental toughness characteristics considered by professionals (quantity surveyors, construction managers, engineers, project managers, architects, estate managers) in the construction industry.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…
Abstract
Purpose
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.
Design/methodology/approach
A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.
Findings
The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.
Originality/value
To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David John Edwards and Eric Asamoah
The purpose of this paper was to first identify and then model the impact of critical success factors (CSFs) of public–private partnership (PPP) power projects.
Abstract
Purpose
The purpose of this paper was to first identify and then model the impact of critical success factors (CSFs) of public–private partnership (PPP) power projects.
Design/methodology/approach
Review of empirical literature came out with 20 CSFs which were ranked by experts and industry practitioners through a two-round Delphi questionnaire survey.
Findings
These CSFs were grouped into CSF groups (CSFGs) using component analysis, and they served as the input variables for fuzzy analysis. The six components were collaboration and transparency, guarantee and permits, socio-political support, expected profitability, technical feasibility and risk allocation (RA). Overall success index of PPP power projects in Ghana was 5.966 and showed there is high impact of CSFGs on project success. Fuzzy analysis also confirmed RA as the most significant CSFG.
Originality/value
The model developed can serve as a multi-dimension CSF framework that can be used as a success attainment tool for PPP power projects. For policy developers and stakeholders, the model serves as a pointer to issues which the government/public sector must focus on to attract huge investments from the private sector in the power sector.
Details