Search results

1 – 5 of 5
Open Access
Article
Publication date: 24 October 2023

Ammar Kabli, Sarah Eltouny and Enas Gouda

This study aims to measure the perception of the residents regarding peer assisted learning in emergency medicine residency program as well as assessing the psychometric…

Abstract

Purpose

This study aims to measure the perception of the residents regarding peer assisted learning in emergency medicine residency program as well as assessing the psychometric properties of the questionnaire used as the research tool.

Design/methodology/approach

A descriptive cross-sectional study was conducted at King Abdullah Medical City, Saudi Arabia, Makkah on a Convenience sample of Emergency Medicine residents who completed peer assisted learning sessions. Data were collected through a questionnaire evaluating the residents’ perception of Peer Assisted Learning. Descriptive statistics were used and statistical significance was set at p < 0.05. The Peer Assisted Learning (PAL) satisfaction questionnaire was tested for construct validity and reliability. Exploratory Factor Analysis (EFA) was conducted. The reliability of the used questionnaire was assessed using Cronbach’s coefficient alpha.

Findings

The study showed that the PAL questionnaire yielded four factors. The four factors are labeled as the following: Factor 1: Cognitive congruence, Factor 2: Social congruence; Factor 3: Teaching skills in Peer Assisted Learning (PAL) session; and Factor 4: Professional development. These results indicated that questionnaire has a good structure validity. In addition, the study showed high internal consistency of the questionnaire. Cronbach’s alpha coefficient value for the total scale was 0.88. The perception of residents was assessed and results revealed residents’ satisfaction regarding Peer Assisted Learning.

Originality/value

Up to the authors’ knowledge, this is the first study which assessed the psychometric properties of a questionnaire measuring the residents’ perceptions regarding Peer Assisted Learning. The study contributed to improving information regarding the psychometric properties and usefulness of PAL questionnaire.

Details

Arab Gulf Journal of Scientific Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1985-9899

Keywords

Book part
Publication date: 5 October 2018

Olubukola Tokede, Adam Ayinla and Sam Wamuziri

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different…

Abstract

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different concept selection methods that were considered for drilling operations at the Trym field in Norway. The construction of drilling rigs is a capital-intensive process, and it involves high levels of economic risk. These risks can be broadly categorised as aleatoric (i.e. those related to chance) and epistemic (i.e. those related to knowledge). Evaluating risks in the investment appraisal process tends to be a complicated process. Project risks are evaluated using Monte Carlo simulation (MCS) and are based on the fuzzy analytic hierarchy process (AHP). MCS provides a useful means of evaluating variabilities (i.e. aleatoric risks) in oil drilling operations. However, many of the economic risks in oil drilling processes are unanticipated, and, in some cases, are not readily expressible in quantitative values. The fuzzy AHP is therefore used to appraise the qualitatively defined indirect revenues comprising risks that affect future flexibilities, schedule certainty and health and safety performance. Both the Monte Carlo technique and the fuzzy AHP technique found that a cumulative revenue variation of up to 30% is possible in any of the considered drilling options. The fuzzy AHP technique estimates that the chances of profitability being less than NOK 1 billion over a five-year period is 0.5%, while the Monte Carlo technique estimates suggest a more conservative proportion of 10%. Overall, the fuzzy AHP technique is easy to use and flexible, and it demonstrates increased robustness and improved predictability.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Article
Publication date: 30 December 2021

Muhammad T. Hatamleh, Gary P. Moynihan, Robert G. Batson, Ammar Alzarrad and Olugbenro Ogunrinde

Risk impedes the success of construction projects in developing countries due to planning in an unpredictable and poorly resourced environment. Hence, the literature suggests that…

Abstract

Purpose

Risk impedes the success of construction projects in developing countries due to planning in an unpredictable and poorly resourced environment. Hence, the literature suggests that practitioners are not fully aware of how important the risk identification process is. Some of the prior studies identified risks in developing countries without highlighting how they can be beneficial to the practitioners in the industry. Therefore, this study highlights this process and identifies the key risks that affect the Jordanian construction industry.

Design/methodology/approach

This study adopted an exploratory sequential mixed approach, two rounds of face-to-face interviews that were conducted in Jordan among 12 experts followed by a questionnaire randomly distributed to 122 practitioners. This study utilized the relative importance index, coefficient of variation, and Mann–Whitney (U) to analyze the data. Also, the factor analysis technique was used to identify and regroup the risk factors to further understand the correlation among the risks.

Findings

The result revealed an agreement among contractors’ and consultants’ responses toward allocating risks. Furthermore, several risks can be traced back to the project communication management process, highlighting a deficiency in the process. Also, four-factor groups were established, the first group includes the risk of defective design, late decisions making by other project participants and poor coordination with the subcontractor. The second group has only the risk of corruption, including bribery at sites. The third group includes stakeholders’ financial instability and inadequate distribution of responsibilities and risks. The fourth group includes adverse weather conditions and the use of illegal foreign labor.

Originality/value

Some of the prior studies identified risks in developing countries without highlighting how they can be beneficial to the practitioners in the industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 December 2023

Vikram Singh, Nirbhay Sharma and Somesh Kumar Sharma

Every company or manufacturing system is vulnerable to breakdowns. This research aims to analyze the role of Multi-Agent Technology (MAT) in minimizing breakdown probabilities in…

Abstract

Purpose

Every company or manufacturing system is vulnerable to breakdowns. This research aims to analyze the role of Multi-Agent Technology (MAT) in minimizing breakdown probabilities in Manufacturing Industries.

Design/methodology/approach

This study formulated a framework of six factors and twenty-eight variables (explored in the literature). A hybrid approach of Multi-Criteria Decision-Making Technique (MCDM) was employed in the framework to prioritize, rank and establish interrelationships between factors and variables grouped under them.

Findings

The research findings reveal that the “Manufacturing Process” is the most essential factor, while “Integration Manufacturing with Maintenance” is highly impactful on the other factors to eliminate the flaws that may cause system breakdown. The findings of this study also provide a ranking order for variables to increase the performance of factors that will assist manufacturers in reducing maintenance efforts and enhancing process efficiency.

Practical implications

The ranking order developed in this study may assist manufacturers in reducing maintenance efforts and enhancing process efficiency. From the manufacturer’s perspective, this research presented MAT as a key aspect in dealing with the complexity of manufacturing operations in manufacturing organizations. This research may assist industrial management with insights into how they can lower the probability of breakdown, which will decrease expenditures, boost productivity and enhance overall efficiency.

Originality/value

This study is an original contribution to advancing MAT’s theory and empirical applications in manufacturing organizations to decrease breakdown probability.

Article
Publication date: 30 July 2020

Mukhtar A Kassem, Muhamad Azry Khoiry and Noraini Hamzah

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are…

1137

Abstract

Purpose

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are opting to optimize the project mainly to mitigate the source of risks in construction to achieve the project expectation. Risk factors cause a threat to the project objectives regarding time, cost and quality. It is additionally a vital component in deviating from the client's expectation of productivity, safety and standards. This research aims to investigate the causes of risk in the oil and gas construction projects in Yemen.

Design/methodology/approach

A comprehensive literature review from various sources including books, conference proceedings, the Internet project management journals and oil and gas industry journals was conducted to achieve the objectives of this study. This initial work was predicated strictly on a literature review and the judgments of experts to develop the risk factor framework for the oil and gas construction projects in Yemen.

Findings

The authors found a few studies related to risk factors in oil and gas construction projects and shared a similar view about general construction projects. However, only a fraction of the factors accepted have included the variances of other studies on a regional basis or specific countries, such as the Yemen situation, due to the differences between the general construction industry and oil and gas industry. Moreover, the factors of these attributes were still accepted due to their applicability to the oil and gas industry, and no significant variances existed between countries. Research has indicated that 51 critical factors cause risks in the oil and gas construction projects in Yemen. Such risk factors can be divided into two major groups: (1) internal risk factors, including seven critical sources of risks, namely client, contractor, consultant, feasibility study and design, tendering and contract, resources and material supply and project management; and (2) external risk factors, including six sources of critical risk factors, namely national economic, political risk, local people, environment and safety, security risk and force-majeure-related risk factors. A risk factor framework was developed to identify the critical risk factors in the oil and gas construction projects in Yemen.

Research limitations/implications

This research was limited to the oil and gas construction projects.

Practical implications

Practically, this study highlights the risk factors that cause a negative effect on the success of oil and gas construction projects in Yemen. The identification of these factors is the first step in the risk management process to develop strategic responses for risks and enhance the chances of project success.

Social implications

The identification of risks factors that cause the failure of construction projects helps develop response strategies for these risks, thereby increasing the chances of project success reflected in the oil and gas sector, which is a main tributary of the national economy in developing countries.

Originality/value

This research is the pioneer for future investigations into this vital economic sector. Given the lack of resources and studies in the field of construction projects for the Yemeni oil and gas sector, the Yemeni government, oil companies and researchers in this field are expected to benefit from the results of this study. The critical risk factors specific to the oil and gas construction projects in Yemen should be further investigated with focus only on Yemen and its oil and gas industry players.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 5 of 5