Search results

1 – 4 of 4
Book part
Publication date: 5 October 2018

Olubukola Tokede, Adam Ayinla and Sam Wamuziri

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different…

Abstract

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different concept selection methods that were considered for drilling operations at the Trym field in Norway. The construction of drilling rigs is a capital-intensive process, and it involves high levels of economic risk. These risks can be broadly categorised as aleatoric (i.e. those related to chance) and epistemic (i.e. those related to knowledge). Evaluating risks in the investment appraisal process tends to be a complicated process. Project risks are evaluated using Monte Carlo simulation (MCS) and are based on the fuzzy analytic hierarchy process (AHP). MCS provides a useful means of evaluating variabilities (i.e. aleatoric risks) in oil drilling operations. However, many of the economic risks in oil drilling processes are unanticipated, and, in some cases, are not readily expressible in quantitative values. The fuzzy AHP is therefore used to appraise the qualitatively defined indirect revenues comprising risks that affect future flexibilities, schedule certainty and health and safety performance. Both the Monte Carlo technique and the fuzzy AHP technique found that a cumulative revenue variation of up to 30% is possible in any of the considered drilling options. The fuzzy AHP technique estimates that the chances of profitability being less than NOK 1 billion over a five-year period is 0.5%, while the Monte Carlo technique estimates suggest a more conservative proportion of 10%. Overall, the fuzzy AHP technique is easy to use and flexible, and it demonstrates increased robustness and improved predictability.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Content available
Book part
Publication date: 5 October 2018

Abstract

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Article
Publication date: 18 October 2021

Ana Karina Silverio, Subashini Suresh, Suresh Renukappa and David Heesom

The increased use and proven benefits of building information modelling (BIM) worldwide suggest that its implementation could be of great help in diminishing inefficient…

Abstract

Purpose

The increased use and proven benefits of building information modelling (BIM) worldwide suggest that its implementation could be of great help in diminishing inefficient traditional practices in the Dominican Republic (DR) construction industry. However, there is no empirical work about the implementation of BIM in the country. This study aims to critically appraise and document the status of the implementation of BIM in the DR to raise awareness and understand how BIM can be successfully implemented in the country.

Design/methodology/approach

A qualitative approach was adopted in which data was collected through semi-structured interviews, with the participation of 53 professionals from 36 construction organisations. The data collected was analysed with the method of content analysis.

Findings

The results confirmed that the DR is a BIM infant country. There are low levels of BIM implementation. The reasons why BIM is not implemented are explored, and a significant interest in implementing BIM in the future was also reported. Drivers to implement BIM include BIM benefits, competitive advantage and pressure from external partners. Current BIM approaches are mainly single-disciplinary, principally in architecture, and the effectiveness and scope of implementation are highly affected by intra-organisational and inter-organisational barriers.

Originality/value

There is a lack of research about the implementation of BIM in the DR. This study bridges this research gap by collecting primary data from Dominican construction organisations and construction professionals to report findings related to BIM implementation.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596

1 – 4 of 4